The City of Phoenix Aviation Department is seeking a qualified consulting firm to provide full‑service engineering support for two new surface parking facilities (6,000 stalls and 1,300 stalls) that will enable the new West Terminal at Phoenix Sky Harbor International Airport. The scope covers programming, preliminary and final design, bid‑phase services, and optional construction administration and inspection. The work will be performed under a Design‑Bid‑Build delivery method and must meet LEED, ADA, and airport‑specific requirements, including stormwater, utility coordination, EV charging, and wayfinding integration. The consultant will also manage the use of the City’s UNIFIER project‑management system and may be required to attend a pre‑submittal meeting on August 31, 2026.
• Design of two commercial asphalt parking lots (≈ 7,300 total stalls)
• Programming, schematic, design‑development, and construction‑document phases
• Coordination with FAA, City utilities, environmental agencies, and airport operations
• Preparation of LEED‑compliant documentation and sustainability reporting
• Optional construction administration, inspection, and warranty services (≈ 11½ months)
• Required deliverables: drawings, specifications, cost estimates, bid packages, and as‑built documentation
• Estimated construction cost: $50 million; consulting fee typically 1‑2 % of construction cost.