Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New York
  4. ›M/WBE & SDVOB Subcontractor & Supplier Opportunity :CUNY Queensboro…

DASNY·New York

M/WBE & SDVOB Subcontractor & Supplier Opportunity :CUNY Queensborough Community College RFK Hall Gym - Locker & Shower Room Renovation & Associated Asbestos Abatement

Closes 10/14/2026$2M – $5MRequest for ProposalLogin required
Get bids like this by emailBid source

Description

Cube Construction Services LLC is soliciting proposals for the Queensborough Community College- RFK Hall Gym- Locker & Shower Room Renovation & Associated Asbestos Abatement project, located at 221-5 56th Ave, Bayside, NY 11364. Please use the link below to access the project drawings, specifications, addenda, and photos: https://www.dropbox.com/scl/fo/9jyzggtpf487jrb095xcw/AGN0vsdQK57P8qA1RDC88D8?rlkey=73jzzu31wo7w076o5iuxd062p&st=99wqt636&dl=0 Brief Scope of Work: The project involves the renovation of the locker and shower facilities at Robert F. Kennedy Hall, Queensborough Community College. The scope of work includes substantial layout upgrades on the cellar floor, along with minor renovations on themezzanine and main floors to improve aesthetics, enhance ADA accessibility, increase plumbing fixture counts, incorporate gender-neutral/family restrooms, and improve overall circulation. All areas included within the scope of work will receive MEP and fire alarm (FA) upgrades, which are being filed under separate applications. All other areas of the building not identified within the scope of work will remain existing and unchanged. The scope of work includes, but is not limited to: Abatement Perform asbestos & ACM abatement as indicated in the documents. Demolition: Selective interior demolition of partitions, CMU, doors, ceilings, finishes, millwork, toilet partitions, and the rolling shutter. Remove existing lockers, abandoned conduit, and abandoned piping. Masonry Perform CMU partition work, infill at removed openings, and patching of existing CMU walls. Install lintels at new openings in masonry walls. Metals Furnish and install cold-formed metal framing and miscellaneous metal fabrications. Provide lintels, overhead supports for toilet and shower partitions, and fixture and equipment supports. Furnish and install powder-coated metal column wraps in Corridor. Millwork Furnish and install fire-retardant blocking for all wall-hung fixtures, accessories, and equipment. Furnish and install plastic laminate casework, counters, and corridor niche millwork. Furnish and install Corian solid-surface countertops. Waterproofing Furnish and install fluid-applied and sheet waterproofing at all shower and wet-area floors and walls. Openings Furnish and install Hollow Metal doors and frames as required. Furnish and install Door hardware. Furnish and install access doors. Furnish and install glazing and mirrors. Furnish and install upward coiling security grille. Drywall & Ceilings Provide and install metal stud framing, gypsum board partitions, shaft walls & GWB Ceilings & soffits. Provide and install acoustical ceiling systems, including Ceramaguard high-humidity tile and grid. Specialties Furnish and install toilet, shower, and changing room partitions and urinal screens. Furnish and install toilet and bath accessories. Furnish and install interior signage systems. Furnish and install corner guards, fire extinguisher cabinets, fire extinguishers, and roller shades. Controls / BAS Furnish and install DDC controls for all terminal units, dampers, and radiation valves. Integrate all new controls with the existing campus BAS, including programming and graphics. Fire Protection Demolish and relocate existing sprinkler piping and heads in renovated areas. Furnish and install a new floor control valve assembly off the existing standpipe, and new sprinkler heads. Plumbing Demolish existing plumbing systems, fixtures, and piping as indicated. Install complete domestic water, sanitary, waste, and vent systems, including underslab piping. Provide all piping, valves, hangers, supports, insulation. Furnish and install all plumbing fixtures, carriers, floor drains, linear shower drains, and trap primers. HVAC Demolish existing ductwork and air terminals in the areas of construction. Furnish and install supply, exhaust, and return ductwork, diffusers, grilles, and accessories. Furnish and install hot-water reheat piping, convectors, and finned-tube radiation. Clean existing duct systems and provide all insulation. Electrical Demolish existing equipment, devices, etc as per contract documents. Install new electrical receptacles, electrical installation of HVAC units, etc. Install new luminaires, lighting switches, lighting control devices, etc. Fire Alarm Remove and relocate existing fire alarm devices in renovated areas. Furnish and install new addressable devices, notification appliances, and damper and fan control modules on the existing Notifier system. Provide programming, filing, and FDNY acceptance testing. Low Voltage / IT Furnish and install Cat 6A cabling, data outlets and other work as per contract documents. Proposal Requirements Labor, Materials, and EquipmentPermits and InspectionsSchedule acknowledgmentAny exclusions or clarifications Please note that this project is subject to PLA (Project Labor Agreement) requirements. Submit your proposal and NYSDOL certificate by October 12, 2026. Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 18.00% WBE Goal: 12.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Henil Patel(Estimator/PM)

[email protected]

(908) 331-4869

Key dates

Opened
10/7/2026
Closes
10/14/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236220
Solicitation №
3774709999

Budget estimate

$2,000,000 – $5,000,000

The renovation involves full interior demolition, asbestos abatement, extensive MEP upgrades, and high‑end finishes (Corian countertops, fire‑rated millwork, etc.) across multiple floors of a college gym. Comparable campus renovation projects of similar size typically range from $2 million to $5 million, depending on material selections, labor rates, and the complexity of asbestos handling. Therefore, a reasonable ball‑park estimate for the subcontractor’s portion of the work is between $2 M and $5 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Dormitory Authority of the State of New York (DASNY)·New York

Top match · 86%

MWBE & SDVOB Opportunities - Baruch College South Campus Boilers and Asbestos Abatement, Baruch College

Closes 11/2/2026Opened 10/5/2026

Dormitory Authority of the State of New York (DASNY)·New York

86% match

MBE, WBE, and SDVOB Subcontractor Procurement for DASNY – Baruch College Information & Technology Building 2nd, 3rd, & 4th Floor Library Renovation & Associated Asbestos Abatement

Closes 10/29/2026Opened 10/14/2026

NYS Boilermatic Welding Industries, Inc.·New York

85% match

CUNY BARUCH COLLEGE SOUTH CAMPUS BOILERS &ASBESTOS ABATEMENT

Closes 11/3/2026Opened 10/7/2026

Dormitory Authority of the State of New York·New York

84% match

CUNY Queens College Hot Water Storage Tank Replacement and Asbestos Abatement

Closes 11/17/2026Opened 10/9/2026

Dormitory Authority of the State of New York (DASNY)·New York

84% match

MWBE & SDVOB Opportunities - Baruch College IT Building Renovation

Closes 10/26/2026Opened 10/5/2026

NYS Rocon Corp.·New York

84% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/5/2026

NYC Health + Hospitals·New York

84% match

MWBE & SDVOB Opportunities - Queens Hospital Dialysis Space Construction (PLA/Union)

Closes 11/6/2026Opened 10/5/2026

NYS Iannelli Construction Co., Inc.·New York

83% match

MWBE/SDVOB- DASNY - CUNY - Queensborough - RFK Hall - Gym & Locker Room - Renovations

Closes 10/30/2026Opened 10/13/2026

NYS PAC Associates of Oswego, Inc.·New York

82% match

NYS MWBE/WBE/SDVOB Solicitation: OCC Coyne Hall Renovations (Onondaga Community College)

Closes 10/28/2026Opened 10/9/2026

NYS Iannelli Construction Co. Inc·New York

82% match

NYS M/W/SDVOB SUBCONTRACTORS

Closes 10/30/2026Opened 9/22/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

82% match

Shower Building Addition NYS Park Police Training Academy

Closes 11/5/2026Opened 9/30/2026

City University of New York (CUNY) – Brooklyn College·New York

81% match

Brooklyn College- Ingersoll HVAC Upgrade

Closes 10/23/2026Opened 9/11/2026

Dormitory Authority of the State of New York·New York

81% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/5/2026Opened 9/24/2026

Dormitory Authority of the State of New York·New York

81% match

CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and Asbestos Abatement (EOI: For Minority and Women-Owned Business Concerns only) 363180 / C1858

Closes 10/15/2026Opened 9/16/2026

Dormitory Authority of the State of New York·New York

81% match

CUNY Baruch College Information & Technology Building 2nd, 3rd, & 4th Floor Library Renovation & Associated Asbestos Abatement

Closes 10/29/2026Opened 9/25/2026

Dormitory Authority of the State of New York·New York

81% match

CUNY York College Exterior Light & Perimeter Fence & Asbestos Abatement (Minority and Women-Owned Business Concerns only)

Closes 11/19/2026Opened 10/14/2026

Nyc Department of Design and Construction·New York

80% match

85026B0110 - ACEDCA215 Brooklyn Children’s Museum HVAC Upgrade

Closes 10/19/2026Opened 10/5/2026

Dormitory Authority of the State of New York·New York

80% match

CUNY Queens College Hot Water Storage Tank Replacement and Asbestos Abatement

Closes 11/17/2026Opened 10/9/2026

Dormitory Authority of the State of New York·New York

80% match

CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and AsbestosAbatement (EOI: For Minority and Women-Owned Business Concerns only)

Closes 10/15/2026Opened 9/16/2026