Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • West Virginia guideWest Virginia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›West Virginia
  4. ›Closed bids
  5. ›Waste Water Treatment Plant - Expression of Interest

State of West Virginia, Department of Administration, Purchasing Division·West Virginia

Waste Water Treatment Plant - Expression of Interest

Closes 6/4/2026$1M – $5MRequest for Expression of Interest
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State of West Virginia, Department of Administration, Purchasing Division is soliciting expressions of interest from qualified firms to provide architectural/engineering services for the upgrade of the Cedar Lakes Conference Center's wastewater treatment plant. The project includes review, evaluation, design, bid preparation, permitting, and construction oversight of a new wastewater treatment plant. The selected firm will be responsible for providing all necessary services to design the facilities, prepare bid documents, and assist with construction oversight. The project goals and objectives include reviewing and analyzing the conditions and operation of the facility, determining the best wastewater treatment solution, and providing a cost-effective and efficient solution that meets the needs of the conference center. • The project requires the selected firm to have experience with similar projects and to demonstrate a clear procedure for communication with the owner during all phases of the project. • The firm should also demonstrate a history of projects that met the owner's budget and a clear plan to ensure this project can be constructed within the project budget. • The firm should have competent and acceptable experience in all expected professional disciplines necessary for the design and completion of the project. • The firm should be prepared to discuss and clarify required items submitted with the expression of interest during oral presentations/interviews.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Larry D McDonnell(Buyer)

[email protected]

(304) 558-2063

Key dates

Opened
5/21/2026
Closes
6/4/2026

Last updated

Details

Type
Request for Expression of Interest
Industry
Civil Engineering
NAICS
541310
Solicitation №
CEOI-1400-AGR2600000001-2

Budget estimate

$1,000,000 – $5,000,000

The budget amount for this project is not explicitly stated in the document. However, based on the scope of work, which includes the design and construction of a new wastewater treatment plant, the estimated cost could be in the range of $1 million to $5 million. This estimate is based on industry standards for similar projects and the fact that the project requires a significant amount of engineering and construction work. Factors that may influence the likely payment range include the complexity of the project, the materials and labor required, and the need for any additional services such as permitting and inspections.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 74%

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

Town of Front Royal·Virginia

74% match

Wastewater Treatment Plant Centrifuge Facility

Closes 10/16/2026Opened 9/9/2026

City of Salisbury·Maryland

73% match

Park Water Treatment Plant PFAS Study 1

Closes 10/20/2026Opened 9/18/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

73% match

TDCJ - Water Treatment Plant for Memorial

Closes 11/23/2026Opened 10/7/2026

Town of Orange·Virginia

73% match

Town of Orange Water Treatment Plant Chemical Feed Building - PPEA

Closes 12/23/2026Opened 9/25/2026

Town of Waterville, Washington·Washington

72% match

Wastewater Treatment Plant - Habitat Mitigation

Closes 10/28/2026Opened 10/10/2026

Town of Groton·Connecticut

72% match

IPSWICH WATER TREATMENT PLANT, DWSRF 19229

Closes 10/26/2026Opened 9/1/2026

Maryland City of Salisbury·Maryland

72% match

Park Water Treatment Plant PFAS Study 1

Closes 10/20/2026Opened 9/19/2026

Pittsylvania County·Virginia

71% match

RFP# 20261014 Hurt Water Treatment Plant

Closes 11/12/2026Opened 10/14/2026

Town of Ipswich·Massachusetts

71% match

Ipswich Water Treatment Plant

Closes 10/26/2026Opened 8/12/2026

Oregon Health and Science University·Oregon

71% match

Waste Stream Management Services

Rolling / TBD closeOpened 4/12/2021

City of Ashland·Oregon

71% match

City of Ashland, Ashland Creek Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

Dickenson County·Virginia

71% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

Oregon City of Ashland·Oregon

70% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Grand Pass·Oregon

70% match

Water Treatment Plant Solids Hauling FY24-26

Closes 12/31/2026Opened 3/1/2023

U.S. Department Of Defense·Connecticut

70% match

Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT

Closes 11/6/2026Opened 9/30/2026

City of Sioux City·Iowa

70% match

WASTEWATER TREATMENT PLANT FACILITY PLAN PHASE 1 IMPROVEMENTS PROJECT

Closes 10/29/2026Opened 10/14/2026

City of Oshkosh·Wisconsin

69% match

2027 WATER CHEMCIALS - WATER FILTRATION AND WASTEWATER TREATMENT PLANT

Closes 10/28/2026Opened 10/8/2026

U.S. Environmental Protection Agency·United States of America

69% match

R--Technical Support for Drinking Water Optimization Program

Closes 10/26/2026Opened 10/9/2026

South Carolina Rural Water Association (SCEMD Grant)·South Carolina

69% match

Notice Of Intent To Sole Source By South Carolina Rural Water Association for Two WaterStep Water On Wheels (WOW) Cart Mobile Water Treatment Units

Rolling / TBD closeOpened 9/9/2026

Town of Front Royal·Virginia

69% match

Wastewater Treatment Plant Magnetite Removal Project

Closes 10/16/2026Opened 9/9/2026

City of Thornton·Colorado

69% match

Wes Brown Water Treatment Plant Ponds Sludge Removal

Closes 10/20/2026Opened 9/17/2026

City of Palm Springs·California

69% match

PALM SPRINGS WASTEWATER TREATMENT PLANT ODOR CONTROL IMPROVEMENTS

Closes 11/9/2026Opened 10/13/2026

Conway Corporation·Arkansas

69% match

Treatment Plant Sludge Removal

Closes 11/3/2026Opened 10/11/2026

City of Neptune Beach·Florida

69% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026