Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Texas
  4. ›Construction
  5. ›Coit Road Paving and Drainage Improvements (Prosper…

Town of Prosper·Texas

Coit Road Paving and Drainage Improvements (Prosper Trail-1400' North of Frontier), CIP 2534-ST

Closes 11/5/2026$15M – $20MRequest for Proposal
Get bids like this by emailBid source

Description

The Town of Prosper is seeking a qualified contractor to design, furnish, and construct a four‑lane, ultimate six‑lane concrete roadway with curb, gutter, and underground drainage on Coit Road (Prosper Trail, 1,400 ft north of Frontier). The Engineer’s estimate is $18,742,316.68. The contract will require a 5 % bid bond or cashier’s check, a performance bond of 115 % of the contract amount, a payment bond of 100 %, and a maintenance bond of 100 % for two years after acceptance. All plans, specifications, and contract documents are available for review at the Town’s Engineering Department or online via IonWave. Proposals are due by 2:00 PM CT on 5 Nov 2026, with a mandatory question deadline of 12:00 PM CT on 26 Oct 2026. The successful contractor must mobilize within 10 days of notice to proceed and complete the work within the schedule defined in the bid documents. • Scope: full road construction (excavation, sub‑grade, concrete pavement, curb & gutter, drainage, sidewalks, median ramps, storm‑water infrastructure, signage, landscaping, irrigation). • Estimated contract value: ≈ $18.7 M. • Bonds required: 5 % bid bond, 115 % performance bond, 100 % payment bond, 100 % maintenance bond (2 yr). • Submission: electronic via IonWave or hard copy at Town Hall; proposal opening 3:00 PM CT on 5 Nov 2026 (Microsoft Teams). • Mandatory pre‑award documentation: bid bond, conflict‑of‑interest form, completed CIP reference worksheet, insurance certificates.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jay Carter(Purchasing Manager)

[email protected]

(972) 569-1018

Key dates

Opened
10/9/2026
Questions due
10/26/2026
Closes
11/5/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
2026-24-B Addendum 1

Budget estimate

$15,000,000 – $20,000,000

The Engineer’s estimate for the project is $18,742,316.68. After accounting for typical contractor profit margins (5‑10 %) and potential change‑order adjustments, the net revenue to the winning contractor is likely to fall between $15 M and $20 M. The exact amount will depend on the final negotiated contract price, bond costs, and any retained insurance or performance guarantees.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Prosper·Texas

Top match · 97%

Coit Road Paving and Drainage Improvements (Prosper Trail-1400' North of Frontier), CIP 2534-ST

Closes 11/5/2026Opened 10/9/2026

Town of Camp Verde·Arizona

84% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Lewis County·Washington

84% match

Boistfort Road Paving Project

Closes 11/19/2026Opened 10/22/2026

Escambia County·Florida

83% match

General Paving and Drainage Pricing Agreement

Closes 11/13/2026Opened 9/16/2026

City of Pueblo·Colorado

82% match

Construction of Sun Mountain Boulevard

Closes 11/4/2026Opened 9/22/2026

Georgia Liberty County Board of Commissioners·Georgia

82% match

MAIN TRAIL ROAD IMPROVEMENTS

Closes 11/17/2026Opened 10/14/2026

City of Blue Hill, NE·Nebraska

82% match

Blue Hill, NE, Blue Hill Railway St. Paving Improvements Railway St. – Saline St. to York St., Blue Hill, Nebraska – 2026

Closes 11/9/2026Opened 10/23/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

82% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT

Closes 11/17/2026Opened 10/14/2026

Town of Church Point·Louisiana

82% match

2026-27 ROAD IMPROVEMENTS PROJECT PHASE 1

Closes 11/10/2026Opened 10/14/2026

Louisiana St. Tammany Parish Government·Louisiana

81% match

Ozone Park Subdivision Drainage

Closes 11/4/2026Opened 10/7/2026

City of Rapid City·South Dakota

81% match

Facility Access Roads and Site Improvements

Closes 10/27/2026Opened 10/10/2026

Georgia Tift County Board of Commissioners·Georgia

81% match

Water, Street & Drainage Improvements - W Phillipsburg Phase 2

Closes 11/17/2026Opened 10/16/2026

Connecticut Department of Transportation·Connecticut

81% match

Quinebaug River Trail – Design‑Build Procurement (State Project No. 0108‑0196)

Closes 10/28/2026Opened 9/9/2026

County of Orange·California

81% match

Modjeska Grade Road, Road and Drainage Improvements

Closes 11/3/2026Opened 10/13/2026

City of Eden Prairie·Minnesota

81% match

Flying Cloud Trail Improvements

Closes 10/29/2026Opened 10/9/2026

Town of Lexington·South Carolina

81% match

CHERRY RIDGE DRAINAGE IMPROVEMENT PROJECT

Closes 10/29/2026Opened 10/14/2026

City of Cheyenne·Wyoming

81% match

Van Buren Ave - Street Curb and Gutter Improvements

Closes 10/27/2026Opened 9/23/2026

Gulf County·Florida

81% match

Bid #2627-06 CEI Services Iola/GU Parker Road

Closes 11/12/2026Opened 10/8/2026

Cascade County·Montana

81% match

Construction of the Evans-Riceville Road Repair

Closes 10/27/2026Opened 10/9/2026

City of Corvallis·Oregon

81% match

Request for Qualifications: General Contractor for MLK Park Project Construction

Closes 10/26/2026Opened 10/9/2026

County of Marin·California

81% match

ENG HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project

Closes 10/27/2026Opened 10/13/2026

Town of Lexington·South Carolina

81% match

Cherry Ridge Drainage Improvements Project

Closes 10/29/2026Opened 10/14/2026

Massachusetts City of Newburyport·Massachusetts

81% match

IFB No. 27-13: Hale Street Drainage Project

Closes 10/28/2026Opened 10/14/2026