This solicitation calls for a firm‑fixed‑price construction effort to modernize the Electronic Health Record Management (EHRM) infrastructure at the Alexandria VA Medical Center in Pineville, LA. The work encompasses selective demolition, new construction, and extensive upgrades to architectural, mechanical, electrical, plumbing, fire‑protection, and telecommunications systems across dozens of campus buildings. The contractor must provide complete design‑build services, manage a complex phased schedule, and meet stringent VA infection‑control, safety, and “One‑Call” utility‑notification requirements.
• Demolition and renovation of 86+ VA buildings, including new duct‑bank installation, utility upgrades, and telecom‑room fit‑outs.
• Installation of HVAC (including CRAC units), electrical power distribution, fire‑suppression, and a campus‑wide fiber‑optic backbone with new access‑control and video‑surveillance equipment.
• Full compliance with VA ICRA (infection‑control) protocols, fire‑rating, erosion‑control, tree‑protection, and coordination with multiple VA departments (OIT, Police, Facilities).