Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Replacement Central Section Sump Pumps for Hoover
More bids in Nevada →

U.S. Department Of The Interior·Nevada

Replacement Central Section Sump Pumps for Hoover

Closes 8/5/2026$70k – $300kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bureau of Reclamation is seeking quotes for the replacement of two central section sump pumps at Hoover Dam. The pumps must be interchangeable with the currently installed sump pumps and have specific characteristics, including a 16HH single stage vertical turbine pump assembly, a 1.5" head shaft assembly, and a 2300 V, 3 phase, 60 Hz, 150 HP motor. The pumps must also meet certain performance requirements, including a flow rate of 5000 GPM and a head of 60 ft. The contractor will be responsible for supplying the pump assemblies, and the government will install them. The delivery of the pumps is expected to be completed within approximately 6 months of the date of award. • The pumps must be interchangeable with the currently installed sump pumps. • The pumps must have specific characteristics, including a 16HH single stage vertical turbine pump assembly and a 2300 V, 3 phase, 60 Hz, 150 HP motor. • The pumps must meet certain performance requirements, including a flow rate of 5000 GPM and a head of 60 ft. • The contractor will be responsible for supplying the pump assemblies. • The government will install the pumps. • The delivery of the pumps is expected to be completed within approximately 6 months of the date of award.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Noah Maye(Point of Contact)

[email protected]

(702) 293-8095

Key dates

Opened
3/19/2026
Questions due
7/30/2026
Closes
8/5/2026
Duration
6 months

Last updated

Details

Type
Request for Quotation
Industry
Energy and Utilities
NAICS
333914
Solicitation №
140R3026Q0054

Budget estimate

$70,000 – $300,000

The budget for this opportunity can be estimated based on the cost of the pumps and the installation. The cost of two high-quality sump pumps with the specified characteristics can range from $50,000 to $200,000, depending on the manufacturer and the specific features. Additionally, the cost of installation, including labor and materials, can range from $20,000 to $100,000. Therefore, the total budget for this opportunity can be estimated to be between $70,000 and $300,000. The factors that may influence the likely payment range include the complexity of the installation, the cost of materials, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Santa Maria Public Airport District·California

Top match · 68%

Sump Pump Replacement and Installation

Closes 10/16/2026Opened 9/30/2026

U.S. Department Of Justice·Indiana

67% match

FCC TERRE HAUTE Heating Condensate Pumps

Closes 11/2/2026Opened 10/6/2026

U.S. Department Of Defense·North Carolina

67% match

John H. Kerr and Philpott Sump Pumps

Closes 10/13/2026Opened 10/1/2026

U.S. Department Of Defense·Virginia

67% match

John H. Kerr and Philpott Sump Pumps

Closes 10/13/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

65% match

PUMP UNIT,CENTRIFUG

Closes 10/30/2026Opened 9/30/2026

U.S. Department Of Defense·United States of America

64% match

16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 10/13/2026Opened 10/9/2026

Massachusetts Town of Ayer·Massachusetts

64% match

Wastewater Pump Impeller and Volute Replacement - Central Ave Pump Station

Closes 10/16/2026Opened 9/16/2026

U.S. Department Of The Interior·Wyoming

64% match

NHTIC HEATING COOLING PUMPS 2026

Closes 10/26/2026Opened 9/24/2026

U.S. Department Of Defense·Oregon

64% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

U.S. Department Of Defense·United States of America

63% match

Pump unit, Centrifug_End_Item_15B02A_NSN_4320013739078FW_PN_UA53885-4

Closes 10/23/2026Opened 10/8/2026

U.S. Department Of Defense·Pennsylvania

63% match

PUMP UNIT,CENTRIFUG

Closes 10/30/2026Opened 9/30/2026

City of Lewiston·Maine

62% match

2026-039 2026 Pump Station Replacements - Foss 2 and Sabattus

Closes 10/27/2026Opened 8/12/2026

City of Chesapeake·Virginia

62% match

IFB 27-014-2230 Pump Station #43 Replacement

Closes 10/27/2026Opened 9/25/2026

U.S. Department Of Defense·United States of America

62% match

16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 10/13/2026Opened 10/9/2026

Town of Tyrone·Georgia

62% match

2026 Generator Replacement Sewer Pump Station #3

Closes 11/4/2026Opened 10/5/2026

State of Alabama·Alabama

62% match

SERV27*383743 Rebuild Patterson Pump HVAC AH

Closes 10/14/2026Opened 10/9/2026

City of Lakeland·Florida

62% match

Annual Water Treatment Plant High Service Pump Maintenance Contractor

Closes 10/29/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

61% match

43--PUMP,CENTRIFUGAL

Closes 10/18/2026Opened 10/7/2026

Madison Metropolitan Sewerage District·Wisconsin

61% match

Pump Repair and Maintenance

Closes 10/16/2026Opened 9/30/2026

U.S. Department Of Veterans Affairs·New York

61% match

N043--FY26 SERVICE - No. 6 Boiler Feed Pump Replacement (1X) - VA New Jersey Health Care, Lyons, NJ

Closes 10/15/2026Opened 9/1/2026

U.S. Department Of Agriculture·District of Columbia

61% match

CAS Education Heat Pump

Closes 10/20/2026Opened 10/1/2026

Upper Occoquan Service Authority·Virginia

61% match

UOSA IFB 27-02 P2NR+ Construction

Closes 10/22/2026Opened 8/24/2026

City of Charlotte·North Carolina

61% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

U.S. Department Of Defense·Pennsylvania

61% match

PUMP UNIT,CENTRIFUG

Closes 10/16/2026Opened 9/16/2026

Hampton Roads Sanitation District·Virginia

61% match

408319 Dozier's Corner Pump Station Repl (AT015400)

Closes 10/20/2026Opened 9/1/2026