The City of Lakeland, through its electric utility, is soliciting a qualified vendor to supply, test, and deliver a complete 60‑inch motor‑operated valve (MOV) assembly—including valve body, gearbox, electric actuator, mounting hardware, and all required accessories—to replace the existing unit in the Unit 5 circulating water system at the McIntosh Power Plant. The contract also requires the vendor to provide a detailed spare‑parts package, factory inspection and testing documentation, full technical submittals, and warranty coverage of at least 12 months (or 18 months from delivery). Delivery, packaging, and transportation to the plant site are included, and the vendor must attend a mandatory pre‑bid meeting on 8 Oct 2026. Bids are due electronically by 22 Oct 2026.
• Supply one complete 60‑inch MOV assembly (valve, gearbox, actuator, hardware) new and unused
• Provide itemized spare‑parts list and pricing for inventory/maintenance
• Conduct factory hydrostatic, functional, and electrical testing; deliver certified test reports
• Submit full engineering drawings, data sheets, warranty, and installation instructions
• Package and ship to McIntosh Power Plant, Lakeland, FL
• Warranty minimum 12 months in service (or 18 months from delivery)
• Mandatory pre‑bid meeting 8 Oct 2026, 9:00 am, site location specified
• Bid submission via OpenGov portal by 3:00 pm 22 Oct 2026