Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Construction
  5. ›GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT…

City of Lauderhill·Florida

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 11/9/2026$1M – $2.5MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Lauderhill is soliciting sealed bids from qualified contractors to fully replace playground equipment, safety surfacing, shade structures/fabrics, and site furnishings at ten municipal parks. The work is turnkey and includes demolition of existing equipment, removal and disposal of old turf and mulch, installation of a certified synthetic turf safety system (with impact‑attenuation pads, drainage, and optional cooling infill), replacement of shade‑fabric covers at nine parks and a brand‑new engineered shade canopy at one park, and installation of new benches and trash receptacles. All work must be completed within 150 calendar days from the Notice to Proceed, adhere to ASTM F1487, F1292, F1951, ADA, and local hurricane‑zone building codes, and be backed by 100 % performance and payment bonds. Bids are due 11/09/2026; a non‑mandatory pre‑bid meeting is scheduled for 10/13/2026. • Scope: demolition, disposal, equipment procurement, turf system installation, shade‑fabric or canopy construction, bench/receptacle supply, permitting, testing, and close‑out documentation. • Locations: ten city parks (John Mullin, Windermere, Ruth Rothkopf, Boulevard Woods, Ilene Lieberman, Sports Park, West Ken Lark, West Wind, Maye Frances Brooks Jenkins, and others). • Required certifications: ASTM‑compliant playground equipment, IPEMA‑listed turf system, hurricane‑resilient anchorage, 10‑year turf warranty. • Bonds: 5 % bid bond; 100 % performance and payment bonds upon award. • Liquidated damages: $500 per day after the 150‑day deadline.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

(954) 777-2051

Key dates

Opened
10/2/2026
Questions due
10/16/2026
Pre-bid meeting
10/13/2026
Closes
11/9/2026
Duration
150 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238990
Solicitation №
2026-064 Addendum 2

Budget estimate

$1,000,000 – $2,500,000

The ten‑park playground replacement involves demolition, new commercial‑grade equipment, a full synthetic‑turf system, shade‑fabric or new canopy structures, and site furnishings. Similar municipal playground renovation projects in South Florida typically range from $1 M to $2.5 M depending on equipment complexity, turf area, and engineering requirements. Assuming an average of 5,000 sf of turf per park (≈ 50,000 sf total) at $20–$30 per sf, plus equipment costs of $300–$500 k per park, and additional $150–$250 k for shade structures and furnishings, the total contract value is estimated between $1.0 M (lower‑end equipment/specs, minimal engineering) and $2.5 M (higher‑end equipment, engineered canopy, extensive testing).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lauderhill·Florida

Top match · 99%

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 11/9/2026Opened 10/2/2026

City of Lauderhill·Florida

97% match

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 10/26/2026Opened 10/2/2026

City of Lauderhill·Florida

86% match

GO BOND PROJECT: HERBERT SADKIN COMMUNITY CENTER EXTERIOR WINDOW REPLACEMENT AND STUCCO REPAIR (TURNKEY)

Closes 10/30/2026Opened 10/9/2026

City of Lauderhill·Florida

86% match

GO BOND PROJECT: HERBERT SADKIN COMMUNITY CENTER EXTERIOR WINDOW REPLACEMENT AND STUCCO REPAIR (TURNKEY)

Closes 10/30/2026Opened 10/9/2026

City of Newark·New Jersey

84% match

Green Parks Projects: NJ Regional Day School, Bo Porter Sports Complex, Mildred Helms Park, and Homestead Park

Closes 11/19/2026Opened 9/16/2025

Douglas County·Nebraska

84% match

Lake James Park Renovation

Closes 10/28/2026Opened 10/7/2026

City of Encinitas / San Dieguito Water·California

84% match

Park Equipment Replacement at Wiro and Orpheus Parks

Closes 11/12/2026Opened 10/15/2026

Douglas County·Nebraska

84% match

Lake James Park Renovation

Closes 10/28/2026Opened 10/7/2026

City of Cleveland, Georgia·Georgia

83% match

RFP Playground Equipment, Safety Surfaces, Delivery and Installation

Closes 11/20/2026Opened 10/19/2026

City of Elgin·Illinois

83% match

Wing Park Renovation

Closes 11/24/2026Opened 9/25/2026

Douglas County·Nebraska

83% match

Lake James Park Renovation

Closes 10/28/2026Opened 10/7/2026

Georgia City of Port Wentworth·Georgia

83% match

City of Port Wentworth Mobley Park Renovation

Closes 11/13/2026Opened 9/28/2026

Gwinnett County Government·Georgia

82% match

Construction of Vines Park Phase II

Closes 10/26/2026Opened 9/23/2026

City of Hays·Kansas

82% match

Bickle Schmidt Sports Complex Poured-In-Place Surfacing

Closes 11/3/2026Opened 10/15/2026

City of Columbia·Missouri

81% match

North Village Park - Playground, Surfacing, and Shade

Closes 10/30/2026Opened 10/9/2026

Pierce County·Washington

81% match

Gonyea Playfield

Closes 11/18/2026Opened 10/16/2026

Burlington County·New Jersey

81% match

Long Bridge Park Playground Construction

Closes 10/29/2026Opened 9/29/2026

Davenport Community Schools·Iowa

81% match

Brady Stadium Turf Replacement Project

Closes 10/29/2026Opened 10/5/2026

Goodwyn Mills Cawood·Alabama

81% match

Beacon Park

Closes 10/30/2026Opened 9/17/2026

Glynn County·Georgia

81% match

Mallery Park Ballfield Renovations and Drainage Improvements

Closes 11/12/2026Opened 10/16/2026

City of Elgin·Illinois

81% match

Wing Park Renovation

Closes 10/28/2026Opened 9/25/2026

City of Irvine·California

81% match

Perimeter Park, CIP 700002

Closes 10/27/2026Opened 9/23/2026

City of Danbury·Connecticut

81% match

"Playground Wood Fiber - Parks Maintenance Dept."

Rolling / TBD closeOpened 9/23/2026

City of Fresno·California

81% match

Logan Park Swings Project

Closes 11/3/2026Opened 10/5/2026

City of Manchester·New Hampshire

81% match

Parks: Manchester Skate Park & Harvell St. Improvement

Closes 11/19/2026Opened 10/9/2026