The Rosebud Lift Station Construction project calls for the complete removal and replacement of an existing wastewater lift station serving the Rosebud Comprehensive Health Care Facility. The new station will be sized for current demand and future expansion, featuring upgraded wet and dry wells, chopper pumps, a modern control system, and a force‑main connection. The work includes demolition of the existing structure, civil site work, utility installations, and associated electrical and instrumentation upgrades.
• Demolish and remove existing lift‑station wet and dry wells, pumps, and associated piping.
• Install new wet‑well, dry‑well, chopper pumps, and a SCADA‑compatible control system.
• Construct new force‑main, water service connections, and utility vaults; provide site grading, concrete work, and fencing.
• Provide all required testing, commissioning, and as‑built documentation for a federal‑funded water‑utility infrastructure upgrade.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.