The City of Orlando is soliciting qualified contractors to replace Lift Station No. 85. The scope includes demolition of the existing lift station, removal and disposal of existing materials, installation of new concrete structures, pumps, piping (PVC gravity sewer, ductile‑iron force mains, water mains, storm‑drain pipes), electrical and control systems, site grading, and final close‑out documentation. The project will be executed under an IFB with electronic submission via OpenGov; a non‑mandatory pre‑bid meeting will be held on‑site and virtually.
• Replace entire lift station (wet well, pumps, control, power, backup generator)
• Provide temporary de‑watering and bypass pumping during construction
• Install new gravity sewer, force mains, water mains, storm‑drain and related fittings
• Perform civil works: excavation, backfill, pavement repair, concrete slabs, site restoration
• Supply and install ancillary equipment: odor control, HVAC, instrumentation, RTU/HMI programming, fencing, gates, and documentation deliverables
• Required compliance with local building permits, erosion control, and SBE participation forms.