The Federal Bureau of Prisons seeks a contractor to refurbish the wastewater lift station at FCI Cumberland, MD. The work involves complete demolition of existing pumps, grinder, auger, electrical disconnects, and control systems, followed by installation of a new stainlessâsteel NEMA 4X control panel with PLC/relay logic, VFDs, surge protection, and HOA switches. Additional tasks include installing a redundant levelâsensing system with audio/visual alarms, new grinder, auger, diverters, three wetâwell pumps plus three spares, upgraded grounding, conduit, and lightning protection, and full functional and hydrostatic testing. The contractor must also provide onâsite training (minimum six hours) and deliver asâbuilt documentation, O&M manuals, warranties, schematics, and PLC programming. Continuous sewage system operation must be maintained throughout, and all work must comply with federal, state, local, NEC, NFPA 820, OSHA, and FBOP security requirements. Quotes are due September 25, 2026 at 10 AM EST.
⢠Demolition and disposal of existing liftâstation equipment
⢠Installation of new stainlessâsteel control panel with PLC/relay logic and VFDs
⢠Redundant levelâsensing system with audio/visual alarms
⢠New grinder, auger, diverters, three wetâwell pumps and three spare pumps
⢠Electrical upgrades: disconnects, ATS, grounding, surge/lightning protection
⢠Full functional, hydrostatic, and manufacturer startup testing
⢠Minimum 6 hours onâsite training and delivery of all asâbuilt documentation