The City of Toledo is seeking a qualified contractor to demolish the existing bath‑house and pool facility at Collins Park. The work includes complete demolition of all building structures, pool infrastructure, concrete decks, and pavements; crushing and on‑site reuse of suitable material; off‑site disposal of unsuitable debris; site clearing, grubbing, and restoration to the condition specified by the City. The contractor must also comply with extensive documentation requirements (city and annual paperwork, construction‑project paperwork, insurance, bonds, and tax‑exempt certificates), provide a bid guaranty, and adhere to prevailing‑wage and living‑wage regulations.
• Full demolition of bath‑house, junior pool, wading pool, filter room, concrete deck (≈ 9,000 sf) and associated utilities.
• Removal, crushing, on‑site placement of reusable material and haul‑off of non‑reusable debris.
• Tree‑protection zone compliance, storm‑water Pollution Prevention Plan (SWP3), and site restoration per specifications.
• Mandatory submission of numerous forms (vendor registration, insurance, workers‑comp, EEE, debarment, living‑wage affidavit, etc.) and a 5 % bid bond (max $200 k).
• Bids submitted electronically via the City’s PlanetBids portal; questions must be entered through the Q&A tab.