Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Information Technology RFPsInformation Technology and Software Development Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More IT services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Advanced Metering Infrastructure (AMI) System and Installation Serv…

City of Pasadena·California

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026$5M – $15MRequest for Proposal
Get bids like this by emailBid source

Description

The City of Pasadena’s Water & Power Department is soliciting a full‑service vendor to design, supply, install, and commission an end‑to‑end Advanced Metering Infrastructure (AMI) for both electric and water utilities. The scope includes a vendor‑hosted head‑end system, a field‑area network, smart electric meters, smart water meters/endpoints, integration with the City’s Oracle C2M and Meter Data Management platforms, testing, commissioning, training, and go‑live support. The contract also requires compliance with city, state, and federal regulations, performance bonds, and living‑wage ordinances. Proposers must submit technical and price proposals electronically by the deadline and attend an optional pre‑proposal meeting. • Provide a vendor‑hosted AMI head‑end platform and communications network (FAN). • Supply and install ~68,000 electric meters and ~38,000 water meters/endpoints. • Integrate meter data with Oracle C2M and Oracle MDMS in the cloud. • Deliver field deployment, testing, commissioning, training, and post‑implementation support. • Meet security, reliability, and interoperability standards; comply with City’s living‑wage and taxpayer‑protection policies. • Submit required forms (non‑collusion, equal‑employment, conflict‑of‑interest, etc.) and a detailed work plan.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jirair Kaprelian(Management Analyst IV)

[email protected]

(626) 744-4005 Ext: 4734

Key dates

Opened
10/13/2026
Questions due
11/3/2026
Pre-bid meeting
10/27/2026
Closes
12/1/2026

Last updated

Details

Type
Request for Proposal
Industry
Information Technology and Software Development
NAICS
541512
Solicitation №
2026-RFP-0143

Budget estimate

$5,000,000 – $15,000,000

A municipal AMI rollout of this scale (≈106,000 total meters) typically runs in the multi‑million‑dollar range. Hardware (smart meters, communication nodes) can represent 50‑60 % of total cost, while services (design, integration, installation, training, support) account for the remainder. Based on comparable U.S. utility AMI projects, a reasonable estimate is between $5 million and $15 million, depending on meter specifications, network architecture, and optional value‑added services (e.g., advanced analytics, extended warranties).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of St. Charles·Illinois

Top match · 91%

Advanced Metering Infrastructure (AMI)

Closes 12/3/2026Opened 9/30/2026

City of Punta Gorda·Florida

89% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 10/26/2026Opened 9/25/2026

City of Punta Gorda·Florida

89% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 10/26/2026Opened 9/25/2026

City of Punta Gorda·Florida

86% match

R2025113/SVC-AMI/1626 - Seeking proposals for a Turnkey Advanced Metering Infrastructure (AMI) water utilities system.

Closes 10/26/2026Opened 9/25/2026

City of Midland·Texas

86% match

direct cellular Advanced Metering Infrastructure (AMI) water meters, cellular communication endpoint

Closes 10/28/2026Opened 10/14/2026

City of North Las Vegas·Nevada

85% match

Customer Portal & AMI Technology

Closes 10/19/2026Opened 9/21/2026

Georgia City of Zebulon·Georgia

85% match

Request for Proposals (RFP) - Advanced Metering Infrastructure System

Closes 10/23/2026Opened 9/23/2026

City of Lodi·California

84% match

Coming Soon! January 2027 AMI RFI

Rolling / TBD closeOpened 10/1/2026

Washington Suburban Sanitary Commission·Maryland

83% match

Request for Qualification - AMI Materials

Closes 12/11/2026Opened 9/23/2026

Nevada Government·Nevada

82% match

Customer Portal & AMI Technology

Closes 10/19/2026Opened 9/21/2026

Washington Suburban Sanitary Commission, MD·Maryland

82% match

Request for Qualification - AMI Materials

Closes 12/11/2026Opened 9/23/2026

City of Punta Gorda·Florida

82% match

SVC-AMI/1626 - Automatic metering Insfrastructure (AMI) Water Utilities System

Closes 10/26/2026Opened 9/25/2026

Massachusetts Town of Holden·Massachusetts

81% match

Water Meter Replacement Program

Closes 10/28/2026Opened 10/9/2026

Texas City of O'Donnell·Texas

81% match

OD-450-26 Water Meter Systems and Related Items

Closes 10/27/2026Opened 9/23/2026

Georgia City of Oxford·Georgia

81% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

City of Pasadena·California

80% match

GPS Asset Tracking Solution

Closes 10/21/2026Opened 9/2/2026

City of Folsom·California

80% match

CITY OF FOLSOM: VARIOUS WATER METER PROCUREMENT CONTRACTS

Closes 11/13/2026Opened 9/24/2026

City of O'Fallon·Missouri

80% match

RFP Sale of Water Meters for Municipal Connections

Closes 11/3/2026Opened 9/2/2026

City of Menlo Park·California

79% match

RFP - Water Billing and Customer Service Support

Closes 10/22/2026Opened 9/18/2026

Arlington County Government·Virginia

79% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 10/16/2026Opened 9/16/2026

Town of Lexington·South Carolina

79% match

SERVICES FOR POTABLE WATER SYSTEM HYDRAULIC MODELING AND PROGRAM MANAGEMENT

Closes 11/5/2026Opened 9/16/2026

City of Pasadena·California

78% match

P-57907 Enterprise Monitoring

Closes 10/29/2026Opened 9/29/2026

City of Seattle·Washington

78% match

Small Single & Multi-Jet Cold Water Meters

Closes 11/18/2026Opened 9/30/2026

City of Port St. Lucie·Florida

78% match

Professional Water Management Consulting Engineering Services for Commercial Irrigation Monitoring, Technical Support, and CUP Compliance

Closes 10/15/2026Opened 9/10/2026