The Wave Waterpark Restroom Remodel Project is a time‑sensitive, full‑scale renovation of the park’s restroom facilities. The scope includes demolition of existing plumbing fixtures, countertops, lighting, partitions, and related finishes; installation of new water‑conserving lavatories, toilets, urinals, flush valves, solid‑surface or quartz countertops, LED lighting with occupancy sensors, moisture‑resistant wall and ceiling coatings, drywall, framing, and a remodeled trellis structure; replacement of water heaters; and complete electrical, plumbing, and finishing work. The contract requires a pre‑bid meeting (mandatory) on 9 Nov 2026, a 60‑working‑day construction window beginning 14 Dec 2026, and submission of bids by 17 Nov 2026. Vendors must provide a bid bond, W‑9, references, and complete a vendor questionnaire.
• Location: Vista, CA (101 Wave Dr)
• Project value: not disclosed (estimated $0.5‑$1.5 M)
• Duration: 60 working days
• Mandatory pre‑bid attendance; no site‑visit required
• Required documents: bid bond, vendor questionnaire, references, W‑9
• Major trades: demolition, plumbing, electrical, drywall, painting, millwork, water‑heater replacement.