Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Connecticut
  4. ›Closed bids
  5. ›Central Connecticut Loop Trail (CCLT) Design

Connecticut River Valley Council of Gov.·Connecticut

Central Connecticut Loop Trail (CCLT) Design

Closes 8/7/2026$1M – $10MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Lower Connecticut River Valley Council of Governments (RiverCOG) is seeking a qualified consulting firm to begin design and engineering of the preferred alternative from the Central Connecticut Loop Trail (CCLT) Study. The study aims to link the Farmington Canal Heritage Trail with the Air Line Trail, a critical 23-mile gap within the CCLT. The CCLT is a vision for a 111-mile loop trail running through 22 cities and towns in central Connecticut. The consulting firm will provide urban design and engineering services, landscape architecture and design services, and civil engineering services. • The project involves designing and engineering a 23-mile route • The consulting firm will provide services such as urban design, landscape architecture, and civil engineering • The project is part of a larger vision for a 111-mile loop trail in central Connecticut • The consulting firm will work with RiverCOG to complete the design and engineering phase of the project

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Vicki Harris(Main Contact)

[email protected]

(860) 581-8554

Key dates

Opened
7/8/2026
Closes
8/7/2026

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
541320
Solicitation №
37864

Budget estimate

$1,000,000 – $10,000,000

The budget for this project can be estimated based on the scope of work, which includes designing and engineering a 23-mile trail. The cost of such a project can range from $1 million to $10 million, depending on the complexity of the design, the materials used, and the labor costs. A more precise estimate would require more detailed information about the project, such as the specific services required and the timeline for completion.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Keene·New Hampshire

Top match · 64%

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Connecticut Department of Economic and Community Development·Connecticut

64% match

CT Communities Challenge Grant

Rolling / TBD closeOpened 12/6/2024

City of Keene·New Hampshire

63% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Upstate Greenways and Trails Alliance·South Carolina

63% match

Swamp Rabbit Trail Orange Line Connection Feasibility Study

Closes 10/23/2026Opened 9/21/2026

Connecticut Department of Transportation·Connecticut

62% match

RFP - Technical Proposal - Quinebaug River Trail in the Town of Plainfield

Closes 10/28/2026Opened 9/9/2026

Massachusetts Department of Transportation·Massachusetts

62% match

609204 BELMONT FAP No. STP/CMQ/TAP-0034(035)X Community Path, Belmont Component of the MCRT (Phase

Closes 11/10/2026Opened 9/14/2026

Georgia Cobb County Department of Transportation·Georgia

62% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

City of Eden Prairie·Minnesota

62% match

Flying Cloud Trail Improvements

Closes 10/29/2026Opened 10/9/2026

City of Cincinnati·Ohio

62% match

Bramble Park Trail

Closes 10/28/2026Opened 7/10/2026

City of Charlotte·North Carolina

61% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

City of Atlanta·Georgia

61% match

QBS/DOT/2620-1270098 PATH Lakewood Trail

Closes 10/30/2026Opened 10/12/2026

Georgia Cobb County Department of Transportation·Georgia

61% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

City of Eden Prairie·Minnesota

61% match

Flying Cloud Trail Improvements

Closes 10/29/2026Opened 10/9/2026

Delaware Valley Regional Planning Commission·Pennsylvania

60% match

Cobbs Creek Trail Extension: Forge to Refuge Trail Advanced Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 10/16/2026Opened 9/4/2026

Columbus Consolidated Government·Georgia

60% match

Dragonfly Trail - River Road Segment

Closes 10/21/2026Opened 8/18/2026

California Department of Transportation·California

60% match

Construct multi-use path, drainage, and rectangular rapid FB system.

Closes 10/22/2026Opened 9/14/2026

Delaware Valley Regional Planning Commission·Pennsylvania

60% match

Valley Forge Gateway Trail Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 10/14/2026Opened 8/14/2026

Alaska Department of Transportation and Public Facilities·Alaska

60% match

RTP Grant Application - Eastland Trails Phase 2A

Rolling / TBD closeOpened 9/24/2026

Connecticut Cromwell Fire District·Connecticut

60% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

North Carolina City of Raleigh·North Carolina

60% match

Re-advertisement Design Build Services Forest Ridge Park Mountain Bike Trail

Closes 10/15/2026Opened 9/24/2026

Alaska Department of Transportation & Public Facilities·Alaska

60% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

Missouri Department of Transportation·Missouri

60% match

TAP-3302(450) KC District, City of Smithville. construction of a multiuse trail in the community.

Closes 10/27/2026Opened 9/29/2026

City of Doge City·Kansas

60% match

Trail St & Overpass CCLIP (due 10/20 @ 1:45pm)

Rolling / TBD closeOpened 9/15/2026