Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Virginia guideVirginia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Virginia
  4. ›Construction
  5. ›Farmville, VA - Farmville Regional Airport - Replace RW…

Delta Airport Consultants·Virginia

Farmville, VA - Farmville Regional Airport - Replace RW 3-21 PAPI'S (24062)

Rolling / TBD close$150k – $300kInvitation for BidLogin required
Get bids like this by emailBid source

Description

This project involves the removal of existing incandescent PAPI (Precision Approach Path Indicator) units on both ends of Runway 3‑21 at Farmville Regional Airport and the installation of new LED PAPI systems, along with associated electrical upgrades. The work includes demolition of two‑unit incandescent PAPI systems, replacement with four‑unit LED PAPI units, replacement of the PAPI Constant Current Regulator in the electrical vault, installation of approximately 650 ft of new conduit, and laying about 3,500 ft of new cable in both new and existing conduit runs. The contractor will be responsible for all electrical and civil work necessary to bring the new lighting system into operation. • Demolish existing incandescent 2‑unit PAPI systems on both runway ends. • Install new 4‑unit LED PAPI systems with updated Constant Current Regulator. • Run ~650 ft of new conduit and ~3,500 ft of cable to support the new lighting. • Perform all related electrical and civil work to integrate the new system with existing airport infrastructure.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
10/22/2026
Closes
Rolling / TBD

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
24062

Budget estimate

$150,000 – $300,000

The scope involves demolition, installation of LED lighting, conduit, and substantial cabling, which for a small regional airport typically runs between $150,000 and $300,000. Costs are driven by material (LED PAPI units, conduit, cable), labor for electrical and civil work, and any required testing/commissioning.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Delta Airport Consultants·Pennsylvania

Top match · 86%

COMING SOON - Clearfield-Lawrence Airport - Install Runway 12-30 Visual NAVAIDs-PAPI (24074)

Rolling / TBD closeOpened 10/22/2026

Port of Fernandina·Florida

79% match

RFP Lighting Improvement

Closes 11/4/2026Opened 10/5/2026

County of Okaloosa·Florida

78% match

Replace Passenger Boarding Bridges Pre-Conditioned Air and Ground Power Units at VPS

Closes 10/28/2026Opened 10/5/2026

Little Rock Municipal Airport Commission·Arkansas

78% match

4R-22L RUNWAY AND TAXIWAY LIGHTING REHABILITATION

Closes 11/18/2026Opened 10/11/2026

Delta Airport Consultants·Virginia

78% match

COMING SOON - Roanoke, VA - Roanoke-Blacksburg Reg. Airport - Rehabilitate Runway 6-24 (24072)

Rolling / TBD closeOpened 5/1/2026

Raleigh Durham Airport Authority·North Carolina

77% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

Harris County·Georgia

77% match

Airfield Lighting

Closes 3/29/2027Opened 2/24/2023

Chesterfield County Airport·Virginia

76% match

Richmond, VA - Richmond Executive-Chesterfield Airport - Extend Runway 15-33 - Package 1 (20030)

Rolling / TBD closeOpened 10/22/2026

U.S. Department Of Defense·Massachusetts

76% match

Hanscom Aero Club Automated Fuel Management System Replacement

Closes 11/6/2026Opened 10/16/2026

U.S. Department Of Defense·Ohio

76% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

City of Charlotte·North Carolina

76% match

Center Lighting Vault Relocation

Rolling / TBD closeOpened 3/15/2027

U.S. Department Of Defense·Virginia

76% match

Airfield Lighting Computer System

Closes 10/28/2026Opened 10/13/2026

Sullivan County·New York

76% match

Design and Installation of Photovoltaic System at the Sullivan County International Airport (R-26-44)

Closes 10/30/2026Opened 10/9/2026

City of Philadelphia·Pennsylvania

76% match

PW PQ Bid 6702 PHL 1675-15 Satellite Thermal Plant Chiller & Cooling Tower Upgrades - Electrical

Closes 10/22/2026Opened 10/5/2026

Power Authority of New York·New York

75% match

ECHDC Pathway Lighting Project -RFI

Closes 10/27/2026Opened 10/5/2026

Port of Portland·Oregon

75% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Maryland Aviation Administration·Maryland

75% match

MAA-MC-27-005 Public Address and Emergency Evacuation Notification System (PAEENS) Upgrade and Maintenance at BWI Thurgood Marshall Airport

Closes 11/16/2026Opened 9/29/2026

U.S. Department Of Defense·Ohio

75% match

Repair Electrical Systems

Closes 11/12/2026Opened 4/20/2026

City of Show Low·Arizona

75% match

Show Low Regional Airport | AWOS | 25944-04

Closes 10/28/2026Opened 10/18/2026

Tampa International Airport·Florida

75% match

Economy Parking Garage AC Replacement

Closes 10/28/2026Opened 8/31/2026