Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Wyoming guideWyoming Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Wyoming
  4. ›Construction
  5. ›AML Project 87, Phase I – Hanna Roadway Infrastructure…

Wyoming State Construction Department·Wyoming

AML Project 87, Phase I – Hanna Roadway Infrastructure Repair - Dept of Environmental Quality

Closes 12/9/2026$3.5M – $5MInvitation for BidLogin required
Get bids like this by emailBid source

Description

This opportunity is a competitive bid for a general construction contract to repair and reconstruct the roadway and associated drainage infrastructure damaged by heavy‑truck traffic at the AML Project 87, Phase I site in Hanna, Wyoming. The State of Wyoming, Department of Environmental Quality – Abandoned Mine Land Division, estimates the work to cost $4.2 million and requires the contractor to complete the work within 160 calendar days after the notice to proceed (anticipated start May 2027). Bidders must be pre‑qualified by WYDOT for specific classifications, submit a 10 % bid bond, and attend a mandatory pre‑bid meeting and on‑site tour on 12 Nov 2026. All bids are to be submitted electronically via the Wyoming State Construction Public Purchase system by 1 PM on 9 Dec 2026. The contract includes performance and payment bonds, retainage, liquidated damages, and compliance with federal Davis‑Bacon, ADA, and civil‑rights requirements. • Roadway reconstruction and storm‑drain improvements in Hanna, WY • Estimated contract value $4.2 M; 160‑day construction schedule • Mandatory pre‑bid meeting & site tour on 12 Nov 2026 (attendance required) • Pre‑qualification required (WYDOT $1 M minimum, specific work classes) • 10 % bid bond (cashier’s check or Surety 2000) and performance/payment bonds required • Electronic submission only; deadline 9 Dec 2026 1 PM MST • Federal and state labor, safety, and reporting compliance mandatory

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lenora Simpson(Bid Contact)

[email protected]

(307) 777-3558

Key dates

Opened
10/23/2026
Questions due
11/20/2026
Pre-bid meeting
11/12/2026Mandatory
Site visit
11/12/2026Mandatory
Closes
12/9/2026
Duration
160 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
27-0689

Budget estimate

$3,500,000 – $5,000,000

The solicitation states an estimated cost of $4.2 million for the full scope of work. Considering typical contractor profit margins (5‑12 %) and potential change‑order adjustments, the net earnings for the contractor are likely to fall between roughly $3.5 million (lower‑end, minimal change orders) and $5 million (higher‑end, with additional scope or premium rates).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

West Virginia Department of Environmental Protection·West Virginia

Top match · 83%

AML- Simpson Creek Highwall, Tipple and Portals Phase II

Closes 11/23/2026Opened 10/26/2026

West Virginia Department of Environmental Protection·West Virginia

83% match

AML- Bridgeport (Tomes) Landslide

Closes 11/4/2026Opened 10/19/2026

West Virginia Department of Environmental Protection·West Virginia

82% match

AML - Shinnston (Sheppard) Mine Drainage

Closes 11/20/2026Opened 10/14/2026

West Virginia Department of Environmental Protection·West Virginia

82% match

AML- Bridgeport (Tomes) Landslide

Closes 11/4/2026Opened 9/18/2026

West Virginia Department of Environmental Protection·West Virginia

82% match

AML- Enterprise Portal

Closes 11/19/2026Opened 10/19/2026

West Virginia Department of Environmental Protection – Office of Abandoned Mine Lands & Reclamation·West Virginia

82% match

AML - Summerlee AMD Treatment

Closes 11/12/2026Opened 10/6/2026

State of Wyoming·Wyoming

81% match

Heavy Equipment Maintenance and Repair

Closes 11/4/2026Opened 10/21/2026

Town of Upton·Wyoming

81% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

City of Pueblo·Colorado

81% match

Construction of Sun Mountain Boulevard

Closes 11/4/2026Opened 9/22/2026

Georgia City of McDonough·Georgia

81% match

ROADWAY RESURFACING PROJECT LMIG-2024-26558-SUP

Closes 11/6/2026Opened 10/2/2026

U.S. Department Of Defense·Missouri

81% match

Levee Repair at MRLS L246

Closes 5/28/2027Opened 5/28/2026

U.S. Department Of Defense·Missouri

80% match

Levee Repairs at Saline County Levee District #2, Ray-Carroll Bottoms Consolidated Levee District of Carroll County, and Howard County Levee District #4

Closes 2/5/2027Opened 11/26/2025

Wyoming State Construction Department·Wyoming

80% match

Engineering Services - Buffalo Bill State Park Parkwide Asphalt Pavement Rehabilitation Project - Dept. of State Parks

Closes 11/4/2026Opened 10/1/2026

Ohio Department of Natural Resources·Ohio

80% match

Lake Logan Dam Improvements

Closes 11/6/2026Opened 10/16/2026

West Virginia Department of Environmental Protection·West Virginia

80% match

AML- Enterprise Portal

Closes 11/19/2026Opened 10/15/2026

Georgia Americus‑Sumter County Payroll Development Authority·Georgia

80% match

Harris Grove Subdivision Site Construction Project

Closes 11/17/2026Opened 10/14/2026

U.S. Department Of Transportation·Wyoming

80% match

WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs

Closes 11/4/2026Opened 10/21/2026

Boone County·Kentucky

80% match

FY 2027 Asphalt Resurfacing Program

Closes 11/10/2026Opened 10/20/2026

U.S. Department Of Transportation·Mississippi

80% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/3/2026Opened 10/8/2026

Kansas Turnpike Authority·Kansas

80% match

Kansas Turnpike Authority Project KTA 8189 – Bridge Painting and Traffic‑Control on I‑335 (Osage & Shawnee Counties)

Closes 11/10/2026Opened 10/14/2026

U.S. Department Of Defense·Missouri

80% match

Missouri Valley Levee Repairs

Closes 1/20/2027Opened 1/20/2026

Lowndes County·Georgia

80% match

TIA-15: Resufacing Phase I

Closes 11/12/2026Opened 10/7/2026

City of Boise·Idaho

79% match

2027 Airport Way & Elevated Roadway Construction

Closes 11/12/2026Opened 9/30/2026

Cascade County·Montana

79% match

Construction of the Evans-Riceville Road Repair

Closes 10/29/2026Opened 10/9/2026