The Town of Washington, Vermont is soliciting qualified engineering firms to design, analyze, and manage the replacement of the Wishing Well Bridge (B‑2 on Williamstown Road, TH‑3). The scope includes a site‑analysis and design phase (hydraulic study review, topographic survey, environmental assessment, permitting, preliminary and final plans) and a project‑management phase (RFP preparation, pre‑bid site visit, bid review, construction oversight, final inspection, and as‑built documentation). The project is FEMA‑funded, requires a mandatory pre‑bid site visit, and proposals are due by 3 PM on 2 Nov 2026.
• Mandatory site visit: 22 Oct 2026, 9 AM (must attend to submit).
• Deliverables: design documents, construction‑phase RFP, supervision during construction, final inspection, as‑built drawings.
• Required qualifications: bridge design experience, especially open‑bottom arch structures, and construction‑phase management.
• Proposal deadline: 2 Nov 2026, 3 PM (sealed submission, no electronic bids).
• Award decision by 16 Nov 2026.