Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›WASTEWATER PRETREATMENT PLANT OPERATION AND MAINTENANCE SERVICES
More bids in District of Columbia →

U.S. Department Of The Treasury·District of Columbia

WASTEWATER PRETREATMENT PLANT OPERATION AND MAINTENANCE SERVICES

Closes 9/15/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bureau of Engraving & Printing (BEP) is seeking a contractor to operate and maintain its Wastewater Pretreatment Plant (WWPP) located in Washington, D.C. The WWPP consists of four systems: Wiping Solution Wastewater Pretreatment Plant (WSWPP), Plating Wastewater Pretreatment Plant (PWPP), Grease Trap Wastewater Pretreatment Plant (GTWPP), and Wiping Solution Recycling Plant (WSRP). The contractor will be responsible for managing, operating, and maintaining the WWPP on a 24/7 basis, including performing tasks such as taking readings, inspections, and maintenance, as well as responding to alarms and correcting conditions to assure proper operation of the system. • The contractor will operate the system with prudent engineering and operating practices. • The contractor will perform inspections and analysis of the WSRP every two hours. • The contractor will start, stop, empty filter presses, and prepare pallets and boxes. • The contractor will change and clean filter press filter cloths as needed. • The contractor will mix system materials as needed for optimal operation. • The contractor will check and perform maintenance on control devices weekly. • The contractor will respond to all alarms and correct conditions to assure proper operation.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Marico Sellers

[email protected]

Key dates

Opened
7/15/2026
Closes
9/15/2026

Last updated

Details

Type
Request for Proposal
Industry
Environmental Services
NAICS
561210
Solicitation №
2031ZA26R00023

Budget estimate

$500,000 – $2,000,000

The estimated budget for this contract can be determined by considering the scope of work and the requirements for operating and maintaining the WWPP. The contractor will need to provide personnel, equipment, and materials to manage and operate the WWPP on a 24/7 basis. The estimated budget may range from $500,000 to $2,000,000 per year, depending on the level of service required and the complexity of the operations. Factors that may influence the likely payment range include the size and complexity of the WWPP, the level of expertise and personnel required, and the cost of materials and equipment needed to maintain the system.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of The Treasury·District of Columbia

Top match · 80%

WASTEWATER PRETREATMENT PLANT OPERATION AND MAINTENANCE SERVICES

Closes 10/27/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

75% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

International Boundary And Water Commission: U.S.-Mexico·Texas

72% match

Operations and Maintenance (O&M) Services for the SBIWTP

Closes 1/6/2027Opened 9/25/2026

Unified Government of Wyandotte County and Kansas City, KS·Kansas

71% match

On Call Wastewater, Stormwater, & Flood Management Facility Maintenance

Closes 10/28/2026Opened 9/10/2026

City of Superior·Wisconsin

71% match

Cleaning Services 2027: Main Treatment Plant

Closes 10/23/2026Opened 9/26/2026

City of Richmond·Virginia

71% match

Wastewater Annual Engineering Services

Closes 10/30/2026Opened 9/30/2026

Missouri Department of Corrections·Missouri

71% match

Wastewater Treatment Services Management

Closes 10/30/2026Opened 10/5/2026

City of Charlotte·North Carolina

70% match

McAlpine Wastewater Mgmt Facility Treatment Facilities Rehabilitation

Rolling / TBD closeOpened 8/3/2026

City of Phoenix·Arizona

70% match

SUB-REGIONAL OPERATING GROUP - 91ST AVENUE WASTEWATER TREATMENT PLANT AERATION REHABILITATION - ENGINEERING SERVICES

Closes 10/16/2026Opened 9/24/2026

North Carolina City of Raleigh·North Carolina

70% match

Digester Gas System – Operational Assistance and Maintenance Services

Closes 10/29/2026Opened 9/18/2026

City of Bakersfield·California

70% match

WASTEWATER TREATMENT PLANTS NO.2 AND 3 SEPTAGE RECEIVING STATION IMPROVEMENTS

Closes 10/29/2026Opened 10/1/2026

Rancho Murieta CSD·California

69% match

RFP for Wastewater Treatment Plant Filter Bed Rehabilitation

Closes 10/22/2026Opened 9/15/2026

City of Hollywood·Florida

69% match

PROFESSIONAL SERVICES RELATED TO WATER AND WASTEWATER TREATMENT PLANT PROGRAM MANAGEMENT (PROJECT NO. 26-1351)

Closes 11/10/2026Opened 10/6/2026

City of Rosenberg·Texas

69% match

Wastewater Treatment Plant No. 1A – Clarifier No. 1 Rehabilitation

Closes 10/15/2026Opened 9/21/2026

City of Colwich·Kansas

69% match

Colwich Wastewater Treatment Plant Improvements

Closes 10/14/2026Opened 9/22/2026

City of Charlotte·North Carolina

69% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

Unified Government of Wyandotte County/Kansas City, Kansas·Kansas

69% match

On-Call Wastewater, Stormwater, and Flood Management Facility Maintenance

Closes 10/28/2026Opened 9/10/2026

U.S. Department Of The Interior·Arizona

69% match

M--OPERATION AND MAINTENANCE OF YDP, IDIQ

Closes 10/16/2026Opened 10/9/2026

Town of Narragansett·Rhode Island

69% match

Professional Engineering Services for Wastewater Projects

Closes 10/20/2026Opened 10/20/2026

Connecticut Town of Shelton·Connecticut

69% match

Heating & Air Conditioning Services for Water Pollution Control Plant & 5 Pump

Closes 10/16/2026Opened 10/2/2026

City of Franklin·Tennessee

68% match

Wastewater Treatment Laboratory Services for the City of Franklin, TN Water Management Department

Closes 10/29/2026Opened 10/8/2026

Village of Tequesta·Florida

68% match

Scrubber, Degasifier, & Membrane Services Contract

Closes 11/5/2026Opened 10/5/2026

Town of Waterville, Washington·Washington

68% match

Wastewater Treatment Plant - Habitat Mitigation

Closes 10/28/2026Opened 10/10/2026

City of Franklin·Tennessee

68% match

Wastewater Treatment Laboratory Services

Closes 10/29/2026Opened 10/8/2026

Georgia Fulton County Purchasing Department·Georgia

68% match

26RFP082426K-DB O&M Services for Camp Creek Managed Assets

Closes 10/15/2026Opened 9/3/2026