The City of Hollywood, FL is soliciting bids for the complete rehabilitation of Stormwater Pump Station No. 2 (SW‑2). The work is divided into three phases: (1) installation of a temporary 20,000 GPM bypass pumping system to maintain uninterrupted stormwater service; (2) structural demolition, concrete repair, CMU wall restoration, and installation of new pump equipment and control drives; and (3) full site restoration, including removal of temporary equipment, pavement and sidewalk repair, and landscaping. The contractor must demonstrate experience with municipal utility infrastructure, temporary flow‑bypass operations, and heavy concrete construction. Bids are due November 25, 2026 via the City’s OpenGov portal. • Phase 1: Design, supply, install, and commission a fully automated bypass pump system (20 k GPM) with hydraulic pumps, temporary discharge piping, equipment pads, and security fencing. • Phase 2: Demolish existing pump‑well top slabs, pour reinforced concrete slab, repair CMU walls and concrete spalls/cracks, install new pumps and drive units. • Phase 3: Remove all temporary structures, restore asphalt, sidewalks, and sodded areas, and ensure drainage outfalls meet municipal standards. • Mandatory qualifications: proven civil/structural utility experience, appropriate licensing, and ability to provide performance and payment bonds (5 % of bid). • Pre‑bid conference (non‑mandatory) on November 3, 2026; questions due November 5, 2026.