Installation of a comprehensive security system on the 6th‑Floor Burn Unit at Parkland Health’s Dallas campus. The work is a turnkey, verification‑first approach that integrates with the existing Lenel OnGuard access‑control platform, adds HID Signo 40 readers, Avigilon video‑intercom stations, and required panel/power upgrades while preserving existing functional hardware. The contractor must provide engineering drawings, obtain permits, submit a panel‑capacity verification report, produce a door‑schedule, perform testing and pre‑turn‑over documentation, and deliver a minimum one‑year warranty on materials. Coordination with Parkland Security, Systems, Infection‑Prevention, Facilities, and other stakeholders is mandatory, and all work must be performed during normal business hours (Mon‑Fri 7 am‑5 pm).
• Turnkey installation that verifies and re‑uses existing infrastructure wherever possible.
• Required hardware includes HID Signo 40 readers, Avigilon licensing, maglocks, emergency glass‑break releases, and panel capacity verification.
• Deliverables: engineering/shop drawings, door‑schedule, panel‑capacity report, as‑built documentation, warranty, and O&M manuals.
• Mandatory compliance with Parkland’s infection‑control, badge, and security policies, and adherence to M/WBE documentation requirements.