The U.S. Army Corps of Engineers (USACE) is conducting market research for a Progressive DesignâBuild (PDB) construction project at Barksdale Air Force Base, Louisiana. The effort involves a secondâfloor expansion of the B6413 Hangar to create secure office, conference, training, and support spaces, requiring demolition of existing interior obstructions, installation of highâperformance STCârated walls, secure networking (NIPR, SIPR, JWICS, SAP), access control, and audio/visual systems. The project must comply with ICD/ICS 705 security standards and historic preservation requirements. The anticipated construction budget is $6.15â$6.39 million, with a total programmed amount of $13.5 million. The Phase 2 construction period is about 1,000 calendar days after award. USACE seeks capability statements and a completed acquisitionâstrategy questionnaire from qualified designâbuild firms, to be submitted by 30 Sept 2026.
⢠Scope: Demolition, structural buildâout, secure facility construction, HVAC/utility extensions, network and accessâcontrol integration, acoustic treatment for âSound Group 4â spaces.
⢠Delivery method: Progressive DesignâBuild under Other Transaction Authority (OTA); FAR does not apply.
⢠Budget: $6.15 M â $6.39 M (construction) within $13.5 M programmed amount.
⢠Timeline: Questions due 22 Sept 2026; response deadline 30 Sept 2026; award targeted Q2âQ3 FY27; performance ~1000 days.
⢠Required submissions: Firm interest confirmation, capability statement (secure facility, PDB experience, technical methods), completed questionnaire (Attachment 02).
⢠Contact: Nicole Esser, Contracting Specialist (USACE).