The Greenville Public Schools district is seeking qualified contractors to design and construct an addition to the existing weight room at Greenville High School. The project involves sitework, concrete, masonry, metal framing, roofing, storefronts, flooring, painting, fire suppression, mechanical, and electrical trades. Construction is scheduled to begin June 5 2027 and be completed by March 6 2028, with a total contract period of roughly nine months. Bids must be submitted by October 27 2026, and a pre‑bid walk‑through is scheduled for October 14 2026. The winning bidder will be responsible for delivering a fully functional, code‑compliant weight‑room facility that meets the school’s specifications and local building codes.
• Scope includes demolition (if required), structural additions, interior finishes, HVAC, electrical, plumbing, and fire‑suppression systems.
• Required trades: sitework, concrete, masonry, metals, general trades, roofing, aluminum storefronts, LPDA, flooring, painting, fire suppression, mechanical, electrical.
• Project location: 111 N Hillcrest St, Greenville, MI 48838.
• Schedule: June 5 2027 – March 6 2028 (≈9 months).
• Bid deadline: October 27 2026 @ 10:00 AM; pre‑bid walk‑through October 14 2026 @ 4:00 PM.