Dakota County is issuing an RFQ for “as‑needed” water‑line, sewer, and septic services across the county. The contract is a two‑year, on‑call arrangement where the selected contractor will supply all labor, materials, equipment, and rates for emergency and routine water‑infrastructure work, including possible work in secured facilities such as the county jail. The contractor must provide detailed hourly rates (regular, overtime, holiday/weekend), material markup, and confirm 24/7 availability if desired. Comprehensive insurance, background‑check, and CJI‑screening requirements apply before any work can commence.
• Scope: Provide all materials, labor, and equipment for water‑line, sewer, and septic services on an as‑needed basis for county facilities.
• Contract term: Jan 1 2027 – Dec 31 2028 (2 years) with no minimum spend guarantee.
• Requirements: Submit rates, insurance certificates, background‑check documentation, and a non‑collusion statement by Oct 16 2026, 2 PM.
• Payment: Invoices paid within 35 days; interest on late payments per Minnesota law.
• Eligibility: Must be a Minnesota‑registered business, maintain specified insurance limits, and pass standard or CJI‑related background checks.