The Pinellas County Board of County Commissioners is seeking a qualified professional engineering consultant to design and deliver comprehensive roadway improvement plans for the 54th Avenue N corridor (from 49th St N to 34th St N). The scope includes geometric design of a four‑lane roadway with a center left‑turn lane, signal timing adjustments, drainage upgrades, right‑of‑way acquisition plans, environmental Level II assessments, and lighting design to meet FDOT standards. The consultant must produce phased design deliverables (preliminary, 60 % and 100 % phases), cost estimates, schedule updates, and respond to county and regulatory review comments. Optional services cover soil/groundwater testing and detailed lighting analysis. All work is to be performed under a non‑continuing contract with monthly invoicing and strict documentation requirements.
• Design of urban roadway: 4 travel lanes, 11‑ft center left‑turn lane, RRFB‑equipped mid‑block crossing.
• Signal timing and drainage improvements.
• Preparation of right‑of‑way acquisition plans.
• Environmental Level II site assessment (soil borings, monitor wells, groundwater sampling).
• Lighting design analysis, voltage‑drop calculations, and cost estimating.
• Deliverables: design drawings, specifications, cost estimates at 60 % and 100 % phases, lighting reports, schedule updates, monthly progress reports.
• Mandatory compliance with ADA, OSHA, E‑Verify, and local SBE requirements.
• Contract length not specified; design phases typically span 6‑12 months.
• Submission deadline: November 3, 2026 via OpenGov; questions due October 23, 2026.