Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Wisconsin
  4. ›Water and Wastewater
  5. ›N-26 Sewer spot repairs, protruding tap and mineral…

City of Appleton·Wisconsin

N-26 Sewer spot repairs, protruding tap and mineral deposit removal

Closes 11/2/2026$100k – $300kInvitation for BidLogin requiredFee to access
Get bids like this by emailBid source

Description

The City of Appleton is seeking a qualified contractor to perform sewer spot repairs, including the removal of protruding taps, mineral deposits, roots, and other obstructions, and to install cured‑in‑place pipe (CIPP) liners for lateral reinstatement. The scope includes full labor, equipment, materials, traffic control, and all necessary permits to complete the repairs at multiple locations within the city’s sewer system. • Provide cured‑in‑place pipe lining for spot repairs. • Remove mineral deposits, roots, and protruding taps. • Perform traffic control and site safety measures. • Deliver all labor, materials, equipment, and associated electrical power. • Ensure compliance with city specifications and bid submission requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Eli Brush(Owner Contact)

[email protected]

(920) 798-5145

Key dates

Opened
10/20/2026
Closes
11/2/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237120
Solicitation №
Quest Number: 10394600

Budget estimate

$100,000 – $300,000

Based on typical municipal sewer repair contracts of similar scope, the total contract value is likely to fall between $100,000 and $300,000. Factors influencing this range include the number of spot repairs required, length of pipe to be relined, and the cost of specialized CIPP equipment and disposal of removed material.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Greenwood Metropolitan District·South Carolina

Top match · 85%

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·Missouri

85% match

MSD Infrastructure Repairs Phase 2

Closes 9/24/2027Opened 9/24/2026

City of Bellevue·Washington

85% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

City of Mansfield·Ohio

84% match

2026 Sanitary Sewer Inflow and Infiltration Reduction Project – City of Mansfield

Closes 10/27/2026Opened 10/9/2026

City of Seattle·Washington

84% match

Spot Sewer Rehabilitation Unit Price Contract 6

Closes 11/4/2026Opened 10/7/2026

City of West Des Moines·Iowa

83% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

City of Wheaton·Illinois

83% match

City of Wheaton 2026 Sewer Main Rehabilitation Project

Closes 10/26/2026Opened 10/9/2026

City of Portsmouth·Virginia

83% match

RFP#332-27-YE PIPE REHABILITATION SERVICES

Closes 10/26/2026Opened 9/8/2026

City of Walterboro·South Carolina

83% match

Middle Ireland Creek Sewer Trunk Line Rehabilitation

Closes 10/27/2026Opened 9/25/2026

City of Albany·Georgia

83% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

Sewerage and Water Board of New Orleans·Louisiana

83% match

Drainage Point Repairs

Closes 11/13/2026Opened 10/20/2026

Johnson County·Kansas

83% match

81st Street and Nieman Road Stream Crossing Repairs – Contract No. SMTC-C046

Closes 10/30/2026Opened 9/29/2026

Louisiana Sewerage and Water Board of New Orleans·Louisiana

82% match

Drainage Point Repairs

Closes 11/13/2026Opened 10/20/2026

Georgia City of Sandy Springs·Georgia

82% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Redlands·California

82% match

2026 CIP SEWER PIPELINE & MANHOLE REPLACEMENT PROJECT

Closes 10/29/2026Opened 10/13/2026

City of Fresno·California

82% match

Sewer Rehabilitation in Clinton, Fruit, McKinley, and West Avenues

Closes 11/3/2026Opened 9/29/2026

City of Aurora, IL·Illinois

82% match

2027 & 2028 Water & Sewer Maintenance Division Plumbing Services

Closes 10/30/2026Opened 10/15/2026

City of Fort Wayne·Indiana

82% match

77635 - 2026 CIPP Pkg 1 Small and Medium Diameter

Closes 11/5/2026Opened 10/16/2026

Johnson County Wastewater·Kansas

82% match

81st Street and Nieman Road Stream Crossing Repairs – Contract No. SMTC-C046

Closes 10/30/2026Opened 9/29/2026

City of Braintree·Massachusetts

82% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026

U.S. Department Of Defense·Missouri

82% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Orange County Sanitation District, CA·California

81% match

3-60 (Construction), Knott-Miller Holder Artesia Branch Rehabilitation

Closes 11/16/2026Opened 9/29/2026

City of Phoenix·Arizona

81% match

LARGE DIAMETER SANITARY SEWER REHABILITATION - GRADE 5 & 4 MANHOLES - NORTH - ZONES 5 & 6 - DESIGN-BID-BUILD

Closes 10/27/2026Opened 10/1/2026

Delaware County Regional Sewer District·Ohio

81% match

Tartan Fields Manhole Replacement

Closes 11/13/2026Opened 10/13/2026

Connecticut Town of Fairfield·Connecticut

81% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026