The City of Killeen is soliciting sealed bids for the design‑build improvement of the Rosewood Drive and Aspen Drive intersection, including traffic signal installation, roadway markings, curb & gutter work, utility relocation, temporary sediment control, and related civil‑engineering tasks. The scope covers demolition of existing concrete sidewalks and curbs, installation of new traffic signals (LED vehicle and pedestrian signals), conduit and fiber‑optic cabling for an Intelligent Transportation System (ITS), and associated site work such as tree removal, drainage, and signage. Bidders must submit a bid form, vendor questionnaire, and a series of mandatory certifications and acknowledgments (conflict of interest, boycott statements, antitrust, etc.). The bid must be submitted electronically via the City’s OpenGov portal by 2:00 pm on November 12, 2026. Questions are due by November 3, 2026. No pre‑bid meeting is scheduled.
• Location: Rosewood Drive & Aspen Drive intersection, Killeen, TX
• Contract type: Invitation for Bid (sealed bid)
• Estimated quantity of work: ~150 LF temporary sediment fence, 880 LF pavement marking, 55 LF concrete curb, 16 SY sidewalks, extensive signal and ITS equipment (≈70 signal heads, 1,100 LF conduit, 1 EA BBU system, etc.)
• Required submissions: Bid Form, Vendor Questionnaire, Conflict‑of‑Interest Form, multiple statutory acknowledgments, references, insurance info, etc.
• Deadline for questions: 2:00 pm, Nov 3, 2026 (via OpenGov)
• Bid submission deadline: 2:00 pm, Nov 12, 2026 (electronic)
• No pre‑bid meeting; site visit not required.
• Award date not disclosed; contract execution expected shortly after bid opening.