Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›Pacheco Pumping Plant Pump 12 Rebuild

Santa Clara Valley Water District·California

Pacheco Pumping Plant Pump 12 Rebuild

Closes 12/8/2026$500k – $1.5MInvitation for Bid
Get bids like this by emailBid source

Description

The Santa Clara Valley Water District is seeking qualified contractors to rebuild Pump 12 at the remote Pacheco Pumping Plant and refurbish its associated 24‑inch cone valve. The contractor must provide all labor, materials, equipment, and supervision needed to disassemble, transport, inspect, repair, re‑coat, dynamically balance, and reinstall the vertical‑shaft turbine pump and valve, then perform start‑up, hydraulic performance, and vibration testing in accordance with Valley Water specifications. The scope also includes preparation of as‑found and as‑built documentation, compliance with prevailing‑wage rules, and provision of required bonds and insurance. • Remove, ship, and rebuild a 24‑in, 2,000 HP vertical turbine pump and 24‑in cone valve. • Perform surface preparation, METCO ceramic coating, bearing replacement, impeller balancing, and hydrostatic testing. • Conduct third‑party start‑up, commissioning, and performance testing; submit detailed inspection reports. • Manage logistics, safety, environmental compliance, and all required documentation, bonds, and insurance.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kelly Grabeel

[email protected]

(408) 630-2397

Key dates

Opened
10/20/2026
Questions due
11/25/2026
Pre-bid meeting
11/17/2026Mandatory
Site visit
11/19/2026Mandatory
Closes
12/8/2026
Duration
170 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
333415
Solicitation №
VW0725

Budget estimate

$500,000 – $1,500,000

The solicitation does not disclose a contract value. Based on typical costs for rebuilding a 2,000 HP vertical turbine pump (including disassembly, transport, re‑coating, bearing replacement, balancing, testing, and associated labor), similar projects range from roughly $0.5 million to $1.5 million. Factors influencing the final amount include the extent of wear discovered during inspection, additional parts needed, travel/logistics costs, and any supplemental services authorized by Valley Water.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lakeland·Florida

Top match · 85%

Annual Water Treatment Plant High Service Pump Maintenance Contractor

Closes 10/29/2026Opened 10/5/2026

The Metropolitan Water District of Southern California·California

83% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

California Department of Parks and Recreation·California

82% match

C26863016 HEARST SAN SIMEON SHM - Reservoir #3 Water Treatment Plant Upgrade

Closes 10/23/2026Opened 9/23/2026

City of Riverside·California

82% match

EFFLUENT 66-INCH VALVE REPLACEMENT

Closes 10/29/2026Opened 10/2/2026

New York City Department of Environmental Protection·New York

82% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

U.S. Department Of Defense·Oregon

82% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

City of Columbia·South Carolina

81% match

WM4830-03 Canal WTP Filter Rehabilitation and Valve Replacements

Closes 10/30/2026Opened 9/11/2026

Santa Clara Valley Water District·California

81% match

COYOTE-ALAMITOS CANAL SHOTCRETE REPAIRS

Closes 11/10/2026Opened 10/13/2026

City of Columbia·South Carolina

81% match

WM4830-03 Canal WTP Filter Rehabilitation and Valve Replacements

Closes 10/23/2026Opened 9/11/2026

Santa Clara Valley Water District·California

81% match

San Francisco Intertie Valves and Joints

Closes 10/30/2026Opened 8/18/2026

City of Visalia·California

81% match

RFB 25-26-64 Replacement of Two (2) HVAC Units at Visalia Water Reclamation Facility

Closes 11/5/2026Opened 10/2/2026

City of Santa Rosa·California

81% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 10/27/2026Opened 9/29/2026

City of Richland·Washington

80% match

Water Treatment Plant Filter Bay Valve Replacement

Closes 11/3/2026Opened 9/27/2026

City of Hollywood·Florida

80% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

New York City Department of Environmental Protection·New York

80% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

City of Worcester·Massachusetts

80% match

Water Booster Pump Skid Replacement / DPW

Closes 11/25/2026Opened 10/20/2026

Department of Water·Hawaii

80% match

IFB Job No. 27-03, Koloa Well F Pump Replacement, Kauai, Hawaii

Closes 11/12/2026Opened 10/19/2026

Santa Clara Valley Water District·California

80% match

Generator and Transfer Switch Installation

Closes 10/30/2026Opened 9/29/2026

Northern Virginia Parks·Virginia

80% match

Brambleton Golf Course - Replacement of Irrigation Pumping Plant

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

80% match

Arcadia Wet Well Rehabilitation

Closes 10/26/2026Opened 10/8/2026