Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Louisiana guideLouisiana Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Louisiana
  4. ›Closed bids
  5. ›City of Gretna Water Plant Generator Switchgear Project

City of Gretna·Louisiana

City of Gretna Water Plant Generator Switchgear Project

Closes 5/27/2026$500k – $2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Gretna is seeking bids for the Water Plant Generator Switchgear Project, which includes controls upgrades to the existing Caterpillar switchgear, replacement of HMI touchscreens, protective relays, and DC batteries, as well as a full preventive maintenance service, arc flash analysis, and coordination study. The project requires a contractor's license from the State of Louisiana and classification as Electrical and/or Category IV, Municipal and Public Works Construction. The work must commence immediately after the Date of Contract and be completed within 240 calendar days. • The project involves upgrades to the existing Caterpillar switchgear • The contractor must obtain a license from the State of Louisiana prior to submitting a bid • The project requires a bid security of 5% of the total bid • A mandatory pre-bid conference will be held on May 22, 2026, at 1:30 pm

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

David Boyd(Bid Contact)

[email protected]

(504) 486-5901

Key dates

Opened
4/29/2026
Pre-bid meeting
5/22/2026Mandatory
Closes
5/27/2026
Duration
240 days

Last updated

Details

Type
Invitation for Bid
Industry
Energy and Utilities
NAICS
22112
Solicitation №
Water Plant Generator Switchgear

Budget estimate

$500,000 – $2,000,000

The budget for this project is estimated to be between $500,000 and $2,000,000, based on the scope of work and the requirements for the project. The estimate is influenced by the cost of materials, labor, and equipment needed for the controls upgrades, replacement of HMI touchscreens, protective relays, and DC batteries, as well as the full preventive maintenance service, arc flash analysis, and coordination study.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Washington Parish Government·Louisiana

Top match · 70%

Washington Parish Generator Support Project – Installation of Permanent Diesel Generators and Automatic Transfer Switches (HMGP #4559‑0056)

Closes 10/29/2026Opened 9/1/2026

Santa Clara Valley Water District·California

68% match

Generator and Transfer Switch Installation

Closes 10/30/2026Opened 9/29/2026

City of Madison·Wisconsin

67% match

Generators

Closes 10/23/2026Opened 10/9/2026

Town of Narragansett·Rhode Island

66% match

Stand-by Generator Replacement - WWTP

Closes 11/6/2026Opened 11/6/2026

Georgia City of Bainbridge·Georgia

66% match

ADVERTISEMENT FOR EMERGENCY GENERATOR IMPROVEMENTS 2026

Closes 11/10/2026Opened 10/7/2026

City and Borough of Sitka·Alaska

66% match

ITB Sitka Generator Replacement

Closes 10/15/2026Opened 9/15/2026

City of Madison - Purchasing Services·Wisconsin

66% match

Generators

Closes 10/23/2026Opened 10/9/2026

NYS LND Technical Services, LLC·New York

66% match

Switchgear Cleaning/Testing and Partial Discharge Testing at Fishkill Correctional Facility

Closes 10/16/2026Opened 9/9/2026

City of Pembroke Pines·Florida

66% match

CDBG-MIT Waste Water Treatment Plant Emergency Power System Replacement

Closes 10/20/2026Opened 8/28/2026

Olmsted County·Minnesota

66% match

Switchgear Controls Replacement

Closes 10/13/2026Opened 9/4/2026

City of Charlotte·North Carolina

66% match

Standby Power and Instrumentation at Tank Sites

Rolling / TBD closeOpened 5/1/2026

Town of Tyrone·Georgia

66% match

2026 Generator Replacement Sewer Pump Station #3

Closes 11/4/2026Opened 10/5/2026

City of Roseville·California

66% match

Design-Assist Construction of Pleasant Grove Wastewater Treatment Plant Electrical Power System Capacity Expansion Project

Closes 10/28/2026Opened 9/2/2026

The City of Hamilton, OH·Ohio

66% match

Switchgear Purchase – Contract #26‑39 – City of Hamilton, Ohio

Closes 10/26/2026Opened 9/28/2026

City of Homestead·Florida

65% match

ITB# 202636-Purchase of Two (2) Low Voltage Switchboards for Wastewater Treatment Plant Backup Generators (Re-Bid)

Closes 10/13/2026Opened 9/18/2026

Olmsted County·Minnesota

65% match

Switchgear Controls Replacement

Closes 10/13/2026Opened 9/4/2026

East Bay Municipal Utility District·California

65% match

Power Generation System Master Plan Project

Closes 10/16/2026Opened 9/8/2026

Georgia Town of Tyrone·Georgia

65% match

2026 Generator Replacement Sewer Pump Station 3

Closes 11/4/2026Opened 10/6/2026

City of Pasadena, TX·Texas

65% match

Design and Construction of Generators

Closes 10/19/2026Opened 9/30/2026

City of Piqua·Ohio

65% match

24-17.9B Major Equipment Project

Closes 10/21/2026Opened 9/8/2026

Town of Narragansett·Rhode Island

65% match

Stand-by Generator Replacement - Wastewater Treatment Plant

Closes 11/6/2026Opened 10/9/2026

Sarasota County·Florida

65% match

Engineering Services for Carlton Water Treatment Plant Backup Power Improvements

Closes 10/15/2026Opened 9/1/2026

City of Richland·Washington

65% match

Metalclad Switchgear - Sandhill Crane Substation Bank 3

Closes 11/3/2026Opened 9/27/2026

City of Port Arthur·Texas

64% match

ELECTRICAL ENGINEER FOR UTILITY OPERATIONS

Closes 10/28/2026Opened 9/29/2026

City of Gretna·Louisiana

64% match

Gretna City Hall Elevator Modernization

Closes 10/21/2026Opened 9/23/2026