The City of St. Cloud is seeking a single qualified contractor to renovate the third‑floor office space of City Hall. The work converts a storage room into a break room and a conference room, adds a new wall, removes a door, and updates finishes, flooring, lighting, electrical, and millwork. The contractor must provide all labor, materials, permits, inspections, and coordination, and must complete the project in a code‑compliant, work‑manlike manner while minimizing disruption to city operations. The bid is limited to one award, with an estimated project cost of $80,000 and a mandatory pre‑bid meeting on October 13, 2026.
• Convert existing file storage room to a new conference room (demolition, new carpet, electrical, media, finishes).
• Convert existing conference room to a new break room (new flooring, cabinetry, painting).
• Install a new interior wall and remove Door A‑351, including framing, patching, and finishing.
• Provide new lighting fixtures, floor‑mounted electrical boxes, and additional receptacles.
• Relocate a wall‑mounted television with associated low‑voltage media.
• Perform all required permitting, inspections, and code compliance; city permits waived for this project.
• Work preferred after hours/weekends to limit disruption; coordination with ongoing HVAC project required.