Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • New Hampshire guideNew Hampshire Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New Hampshire
  4. ›Civil Engineering
  5. ›Ashuelot Rail Trail Bridge (KSC) Rehab

City of Keene·New Hampshire

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026$200k – $500kInvitation for BidLogin required
Get bids like this by emailBid source

Description

The City of Keene, NH, is soliciting qualified contractors to remove and replace the timber members of the Ashuelot Rail Trail bridge over the Ashuelot River. The work includes demolition of existing timber components, installation of new pressure‑treated wood sleepers, sub‑floor, composite decking, handrails, and site restoration, all funded by federal RTP money. Bidders must submit a complete bid package electronically or in person by the deadline, attend an optional pre‑bid Zoom meeting, and be prepared to commence work within 45 calendar days for substantial completion and finish the contract within 60 calendar days. Liquidated damages of $500 per day apply for delays.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Yves P. Gakunde(Bid Contact)

[email protected]

(603) 357-9800

Key dates

Opened
10/21/2026
Pre-bid meeting
11/10/2026
Closes
11/24/2026
Duration
60 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
01-27-20

Budget estimate

$200,000 – $500,000

No contract value is disclosed in the documents. Based on typical costs for timber bridge rehabilitation of this size (approximately a small pedestrian/rail‑trail bridge), material and labor expenses are likely in the low‑to‑mid six‑figure range. Assuming $150–$250 per square foot for demolition, timber replacement, decking, railings, and site restoration, the total bid could fall between $200,000 and $500,000. Factors influencing the final amount include the length of the bridge span, site access constraints, and any additional environmental mitigation required under the federal RTP funding.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Keene·New Hampshire

Top match · 97%

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

82% match

Pell Bridge Rehabilitation

Closes 11/2/2026Opened 9/1/2026

Connecticut Dept. of Transportation·Connecticut

82% match

Rehabilitation of Bridge No. 02150 in the Town of Stratford

Closes 10/28/2026Opened 9/30/2026

City of High Point·North Carolina

81% match

Bid 09-110426 Bridges Preservation Project

Closes 11/4/2026Opened 10/2/2026

City of Keene·New Hampshire

81% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Connecticut Dept. of Transportation·Connecticut

81% match

Rehabilitation of Bridge No. 02150 in the Town of Stratford

Closes 10/28/2026Opened 9/30/2026

City of Lebanon·New Hampshire

81% match

Lebanon 24222 NH Route 120 (Hanover Street) Bridge Rehabilitation

Closes 10/22/2026Opened 9/25/2026

Georgia City of Chattahoochee Hills·Georgia

81% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

New York City Department of Transportation·New York

80% match

BID EXTENSION: COMPONENT REHABILITATION OF 8 BRIDGES IN THE BOROUGH OF BROOKLYN

Rolling / TBD closeOpened 4/3/2020

Massachusetts Department of Transportation·Massachusetts

80% match

607420 NATICK FAP No. HIP(NGB)-003S(965)X Bridge Replacement, N-03-012, Boden Lane over CSX/MBTA

Closes 10/27/2026Opened 9/8/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

80% match

Misc. Steel Repairs - MHB

Closes 11/4/2026Opened 10/20/2026

Massachusetts Department of Transportation·Massachusetts

80% match

609068 SHEFFIELD FAP No. STP(BR-OFF)-003S(993)X Bridge Replacement, S-10-015, Kelsey Road over Sch

Closes 11/10/2026Opened 9/8/2026

Platte County Parks Department·Missouri

80% match

Burlington Creek Bridge Remediation

Closes 11/5/2026Opened 10/19/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

80% match

Addendum 1

Closes 11/2/2026Opened 9/19/2026

Massachusetts Department of Transportation·Massachusetts

80% match

612874 SHREWSBURY-WORCESTER Bridge Preservation, S-14-021=W-44-115, I-290 (EB and WB) over Lake Qu

Closes 10/27/2026Opened 8/31/2026

City of Keene·New Hampshire

80% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Charlotte·North Carolina

80% match

Bridge Repair Design

Rolling / TBD closeOpened 6/30/2028

City of Columbia·Missouri

80% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026

Connecticut Dept. of Transportation·Connecticut

80% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

City of Charlotte·North Carolina

79% match

Morris Field Bridge Replacement

Rolling / TBD closeOpened 5/1/2026

Massachusetts Department of Transportation·Massachusetts

79% match

612193 ANDOVER FAP No. HIP(NGB)-0934(003) Bridge Preservation, A-09-022, I-93 over Merrimack River

Closes 11/3/2026Opened 8/24/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

79% match

Addendum 3

Closes 11/2/2026Opened 9/1/2026

Massachusetts Department of Transportation·Massachusetts

79% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

Monroe County·New York

79% match

Moscow Road Bridge Replacement Project

Closes 10/22/2026Opened 9/26/2026