The District Wide Digital Cabling Project – Phase III is a procurement by Stockton Unified School District to install structured digital cabling across multiple school sites. The bid tabulation sheet records a single submitted bid from AMS.NET for $156,132.31, but no award decision is included. This opportunity reflects a mid‑six‑figure, district‑wide networking infrastructure effort, likely encompassing design, material supply, and installation of fiber‑optic or copper cabling throughout the district’s facilities.
• Scope: Design, supply, and install district‑wide structured cabling (Phase III).
• Procurement method: Open competitive bid (full and open competition).
• Estimated value (based on the sole bid) ≈ $156 K, indicating a modest‑size project suitable for firms specializing in school‑district telecommunications installations.
• No award, start, or end dates are provided; the only concrete date is the bid opening on May 10 2016.