Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Connecticut
  4. ›Closed bids
  5. ›Hartford Water Pollution Control Facility Site Entrance and Securit…

Awarded contract·The Metropolitan District·Connecticut

Hartford Water Pollution Control Facility Site Entrance and Security Improvements Project

Won by L. Holzner Electric$1.3MAwarded 6/30/2017Single Award
Contract source

Awarded vendors

  • L. Holzner Electric

Description

This contract involves the design‑build of entrance and security upgrades for the Hartford Water Pollution Control Facility. The scope covers new pavement, entrance and parking areas, signage, a control booth, cantilever gate frames, fencing, an LED plant sign, electrical and instrumentation upgrades, lighting, security cameras, and card‑access systems for gates and the control booth. All labor, equipment, permits, and related costs required to complete the construction are included, and the work must comply with Section 01010 Summary of Work and applicable Connecticut statutes. The project requires a pre‑bid conference and a mandatory 10 % bid security. • Site improvements include parking, gates, fencing, and signage. • Security upgrades encompass cameras, lighting, and card‑access control. • Electrical and instrumentation work integrates new LED signage and control‑booth systems.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
4/11/2017
Intent to award
6/30/2017
Awarded
6/30/2017

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
236220
Solicitation №
2017B-07

Contract value

$1,250,490

The award record shows a Lump Sum Unit Price Override of $1,250,490 for L. Holzner Electric, which is effectively the contract’s award amount. Assuming no major change orders, the contract value is approximately $1.25 million. This estimate aligns with the scope (site entrance, parking, fencing, lighting, security systems) typical for a mid‑size municipal infrastructure upgrade.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Middletown·Ohio

Top match · 68%

Water Reclamation Facility Secondary Aeration Improvements

Closes 10/13/2026Opened 9/1/2026

The Metropolitan Water District of Southern California·California

68% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

Georgia City of Hephzibah·Georgia

67% match

Addition to Existing Water Pollution Control Plan

Closes 11/5/2026Opened 9/28/2026

So. Central Connecticut Regional Water Auth.·Connecticut

67% match

Route 80 Control Valve Improvements – Phase 2

Closes 10/28/2026Opened 9/23/2026

Minnesota Department of Natural Resources·Minnesota

67% match

Hinckley Area Office Rearing Ponds Water Supply

Closes 10/13/2026Opened 9/26/2026

Connecticut Cromwell Fire District·Connecticut

66% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

U.S. Department Of Defense·Connecticut

66% match

Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT

Closes 11/6/2026Opened 9/30/2026

Connecticut Cromwell Fire District·Connecticut

66% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

Erie County·New York

66% match

ERIE COUNTY SEWER DISTRICT NO. 3 SOUTHTOWNS ADVANCED WASTEWATER TREATMENT FACILITY PHASE 2 EXPANTION CONTRACT NO. 75

Closes 11/5/2026Opened 9/22/2026

City of Charlotte·North Carolina

66% match

University Pond Water Quality Enhancement Project

Rolling / TBD closeOpened 5/14/2026

Connecticut City of Bristol·Connecticut

66% match

Diffused Aeration System Replacement

Closes 10/23/2026Opened 9/25/2026

Town of Eatonville·Florida

66% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Connecticut UConn Health Center·Connecticut

66% match

Snow Removal and Ice Control Services for 65 Kane St. West Hartford

Closes 11/2/2026Opened 10/2/2026

Connecticut Town of South Windsor·Connecticut

66% match

Clark Street Pump Station Main Replacement Project

Closes 11/4/2026Opened 10/6/2026

Village of Wellington·Florida

65% match

Water Reclamation Facility Solids Control Room Relocation Project.

Closes 10/29/2026Opened 9/29/2026

Town of Ipswich·Massachusetts

65% match

Ipswich Water Treatment Plant

Closes 10/26/2026Opened 8/12/2026

City of Huron·Kansas

65% match

Wastewater Treatment Facility (WWTF) Improvements - Huron, KS

Closes 10/29/2026Opened 9/28/2026

Connecticut Town of Naugatuck·Connecticut

65% match

FY27-B142

Closes 2/26/2027Opened 10/7/2026

Henrico County Government·Virginia

65% match

ITB No. 26-2989-8EAR - Water Treatment Facility - HVAC Improvements

Closes 10/14/2026Opened 8/21/2026

Georgia City of Cartersville·Georgia

65% match

WATER TREATMENT PLANT CHEMICAL FEED AND CONTROL BUILDING UPGRADES

Closes 10/16/2026Opened 9/15/2026

Connecticut Town of Stratford·Connecticut

65% match

Diversion Chamber C Inlet Pipe Modifications -WPCF

Closes 10/16/2026Opened 9/17/2026

Town of Groton·Connecticut

65% match

IPSWICH WATER TREATMENT PLANT, DWSRF 19229

Closes 10/26/2026Opened 9/1/2026

City of Austin·Texas

65% match

Ullrich WTP Inherently Safer Disinfection Conversion

Rolling / TBD closeOpened 4/27/2026

City of Austin·Texas

65% match

Hornsby Bend Ammonia Removal Facility And Drainage Imp.

Rolling / TBD closeOpened 6/29/2026

Virginia Tech·Virginia

65% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026