This solicitation calls for comprehensive architectural and engineering design services for the complete renovation of Robinswood Middle School in Orlando, FL. The project will address life‑safety, accessibility, functional equity, and modernization of all building systems, and may include demolition and new construction on an occupied campus. The design phase begins in June 2025, with construction slated to start December 2026 and substantial completion targeted for June 2028. The total construction estimate is $46.62 million, with design services likely representing a significant portion of that budget.
• Scope includes full campus renovation, redesign of interior spaces, upgrades to mechanical, electrical, and plumbing systems, and temporary facilities for phased construction.
• Project schedule: Design/Pre‑construction (June 2025), Notice to Proceed (December 2026), Substantial Completion (June 2028).
• No bid bond, performance bond, or insurance requirements; online submission accepted; one pre‑bid WebEx meeting on 2/3/2025.
Attached files
The award documents live at the source — open the contract source above to download them.