The City of Johnson City, Tennessee is procuring a complete replacement of a walk‑in freezer at Science Hill High School. The contract requires removal of the existing unit, delivery and installation of a custom‑built, NSF‑listed freezer meeting detailed dimensional and material specifications, and integration with two existing refrigeration systems. Work must be completed by mid‑July 2026 under a lump‑sum price, with the award expected to go to Mobile Fixture and Equipment Co., Inc. after a competitive bid process that attracted only two responsive vendors.
• Scope includes demolition, disposal, custom fabrication, installation, electrical and plumbing tie‑ins, commissioning, and a one‑year warranty.
• Technical specs call for 4‑in. DURATHANE insulation, aluminum panel walls, 48×76 in. door with vapor‑proof lighting, and a 1/8‑in. aluminum tread‑plate floor.
• Mandatory site visit, Tennessee contractor’s license, extensive insurance, drug‑free workplace and criminal‑history affidavits, and compliance with NSF, ANSI, NFPA, ASME, and IECC standards.