The Utah Department of Transportation (UDOT) issued a Request for Proposals (RFP) for a ROADSIDE TOLL SYSTEM FOR TAAS PROTOTYPE. The contract was awarded to Blissway Inc. The RFP process was used to determine the best value to the State, considering criteria in addition to cost. The evaluation committee assessed the proposal based on mandatory minimum requirements, technical scores, and cost proposal evaluation. The contract award was determined to be fair and reasonable, with a total cost of $500,000.
• The contract involves the provision of a roadside toll system for a TAAS prototype.
• The system must meet specific requirements and qualifications, including mandatory minimum requirements and technical scores.
• The evaluation committee assessed the proposal based on criteria such as firm qualifications, key team qualifications, approach to scope of work requirements, and approach to implementation, operations, and support.
• The contract award was made to the proposal with the highest technical and cost points.
• The contract has a total cost of $500,000, with a breakdown of $250,000 for Zone 250 and $250,000 for Zone 255.