Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier,…
More bids in Virginia →

U.S. Department Of Defense·Virginia

Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI

Closes 8/26/2026$100M – $250MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This Design-Bid-Build project involves the demolition of an existing condemned US Navy pier and the construction of a new pier for four Offshore Patrol Cutters (OPCs), along with a new bulkhead, laydown area, parking, stormwater management, fire/potable water, electrical, telecommunications, and compressed air utilities. The project will be constructed at Naval Station Newport, Rhode Island. The contractor will be required to perform the work within 918 calendar days, including the 15 calendar days for submission and approval of performance and payment bonds after the contract award. The contractor must also provide a signed Project Labor Agreement with their Price Proposal submission. • Demolition of an existing condemned US Navy pier (1,570 feet long x 100 feet wide) • Construction of a new pier (1,000 feet long x 80 feet wide) for four Offshore Patrol Cutters (OPCs) • Construction of a new bulkhead (360 feet long) • Laydown area, parking, stormwater management, fire/potable water, electrical, telecommunications, and compressed air utilities • Performance period: 918 calendar days • Required to submit a signed Project Labor Agreement with Price Proposal submission

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kristy GERREK(Contracting Officer)

[email protected]

(757) 341-0089

Key dates

Opened
11/19/2025
Pre-bid meeting
12/4/2025
Closes
8/26/2026
Projected award
9/1/2026
Duration
918 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
N4008526R0001

Budget estimate

$100,000,000 – $250,000,000

Based on the project's scope, including the demolition of an existing pier and the construction of a new pier, bulkhead, and other related infrastructure, the estimated budget for this project could range from $100 million to $250 million. This estimate is supported by the NAICS code 237990, which indicates that the project falls under the category of Heavy and Civil Engineering Construction. The actual budget may vary depending on various factors such as the contractor's bid, the complexity of the project, and any potential change orders or modifications to the original scope of work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Virginia

Top match · 78%

N4008526R0228 DESIGN-BUILD (DB), REPAIR OTC DORM KING HALL BLDG 291, NAVAL STATION NEWPORT RI, NEWPORT RHODE ISLAND

Closes 10/16/2026Opened 7/21/2026

U.S. Department Of Defense·Rhode Island

76% match

P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT RI

Closes 10/27/2026Opened 10/8/2026

U.S. Department Of Defense·Rhode Island

75% match

N4008526R0228 DESIGN-BUILD (DB), REPAIR OTC DORM KING HALL BLDG 291, NAVAL STATION NEWPORT RI, NEWPORT RHODE ISLAND

Closes 10/29/2026Opened 10/13/2026

City of Newport News·Virginia

75% match

Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/2/2026Opened 10/8/2026

U.S. Department Of Homeland Security·Maryland

74% match

Dry-Dock: USCG STA CAPE MAY (45665) FY27 UWB

Closes 10/28/2026Opened 9/25/2026

U.S. Department Of Defense·North Carolina

74% match

Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina

Closes 10/15/2026Opened 10/1/2026

U.S. Department Of Homeland Security·Michigan

74% match

USCG ANT SAGINAW RIVER (49422) & USCG ANT DETROIT (49424) FY27 INDUSTRIAL REPAIR

Closes 10/16/2026Opened 9/30/2026

U.S. Department Of Commerce·Alaska

74% match

Y--NOAA/USCG Cutter STORIS Homeporting Project

Closes 10/16/2026Opened 9/29/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

74% match

Design, Build, Deliver and Commission 3 patrol vessels

Closes 10/30/2026Opened 10/7/2026

City of Newport News·Virginia

73% match

IFB# 27-2089-6256, Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/19/2026Opened 10/8/2026

U.S. Department Of Homeland Security·Connecticut

73% match

USCG Cutter Eagle New Dredging for Berthing at New London City Pier

Closes 10/22/2026Opened 10/8/2026

City of Newport News·Virginia

73% match

Newport News Seafood Market

Closes 10/29/2026Opened 9/29/2026

Town of Highland Beach·Florida

73% match

Marine Access Facility Construction

Closes 11/12/2026Opened 10/9/2026

U.S. Department Of Homeland Security·Rhode Island

73% match

USCG Cutter Eagle New Dredging for Berthing at New London City Pier

Closes 10/15/2026Opened 7/27/2026

U.S. Department Of Defense·U.S. Armed Forces – Europe

73% match

US Coast Guard Cutter (USCGC) EMLEN TUNNELL (WPC 1145) FY 27 QL3 Dockside Availability

Closes 10/27/2026Opened 9/24/2026

U.S. Department Of Defense·Virginia

73% match

Submarine Rescue Vessel Extended Time Charter

Closes 10/15/2026Opened 10/2/2026

U.S. Department Of Homeland Security·Maryland

73% match

Dry-Dock: USCG ANT PUGET SOUND (55107) FY27 DD

Closes 11/5/2026Opened 9/25/2026

U.S. Department Of Defense·Connecticut

73% match

Design-Bid-Build, P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut

Closes 10/14/2026Opened 9/30/2026

U.S. Department Of Homeland Security·Maryland

73% match

USCG ANT SAGINAW RIVER (49422) & USCG ANT DETROIT (49424) FY27 INDUSTRIAL REPAIR

Closes 10/16/2026Opened 9/16/2026

U.S. Department Of Defense·Virginia

73% match

Design-Bid-Build, P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut

Closes 10/14/2026Opened 11/6/2025

Town and County of Nantucket·Massachusetts

72% match

Town Pier Repairs & Improvements

Closes 10/29/2026Opened 9/16/2026

U.S. Department Of Defense·Virginia

72% match

Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina

Closes 10/15/2026Opened 3/31/2026

U.S. Department Of Commerce·Virginia

72% match

Y--NOAA/USCG Cutter STORIS Homeporting Project

Closes 10/16/2026Opened 7/23/2026

U.S. Department Of Defense·California

72% match

USS GREEN BAY (LPD-20) Boats: 7MRBX0502, 7MRB0503, 11MRX1401, and 11MRX0504 Stand Alone

Closes 10/20/2026Opened 10/13/2026

U.S. Department Of Defense·Virginia

71% match

Solicitation N4008526R0187 MULTIPLE BARRACKS RENOVATION AT SOUTH CAROLINA MARINE CORPS BASES

Closes 10/15/2026Opened 5/21/2026