Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Arizona
  4. ›Closed bids
  5. ›Proposal for Compound Wastewater Construction for Rock Point Chapter

Navajo Nation·Arizona

Proposal for Compound Wastewater Construction for Rock Point Chapter

Closes 4/24/2026$500k – $1.5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Navajo Nation Fiscal Recovery Fund Office is seeking a qualified contractor to design, obtain permits for, and construct a new on‑site wastewater treatment system for the Rock Point Chapter compound. The work includes comprehensive site assessments, soil investigations, engineering design options, removal of the existing septic system, procurement of construction permits, installation of treatment infrastructure, and delivery of an Operations & Maintenance package, with completion required by 31 December 2026. • Design engineered commercial on‑site wastewater treatment system (OWTS) with pretreatment for high‑strength waste. • Perform soil borings, percolation tests, and provide stamped engineering reports; obtain NNEPA construction permit, SWPPP, TCP, and SSP. • Excavate, grade, install OWTS components, replace or upgrade septic system, and provide final inspection, O&M documentation, and close‑out reporting.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lyle C. Begay(Civil Engineer)

[email protected]

(928) 309-5539

Key dates

Opened
4/20/2026
Questions due
3/18/2026
Closes
4/24/2026
Projected award
4/29/2026
Duration
8 months

Last updated

Details

Type
Request for Proposal
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
Bid No. 26-01-4005SB

Budget estimate

$500,000 – $1,500,000

No contract value is disclosed, but a full design‑build wastewater treatment plant for a tribal chapter typically ranges from $500 k to $1.5 M depending on system size, site conditions, and material costs. The estimate assumes a mid‑size OWTS (≈30,000‑40,000 gal/day capacity) with moderate soil remediation and a 6‑month construction schedule.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of The Interior·Colorado

Top match · 74%

Y--GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ

Closes 11/2/2026Opened 6/26/2025

City of Roseville·California

73% match

Construction Services: DCWWTP Primary Sedimentation Basin Rehabilitation Project

Closes 10/27/2026Opened 8/25/2026

U.S. Department Of The Interior·Colorado

73% match

Y--GRCA 257282 - Replace Wastewater Plant at South Ri

Closes 11/2/2026Opened 7/31/2026

Fort Pierce Utilities Authority·Florida

72% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026

City of Neptune Beach·Florida

72% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

City of Dunedin·Florida

72% match

Water Production Well Facilities Project

Closes 11/18/2026Opened 10/12/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

72% match

New Sewage Treatment Plant – Skylands Manor (Re‑Bid)

Closes 10/15/2026Opened 9/2/2026

Tarrant Regional Water District·Texas

71% match

Engineering Services for Richland Chambers Lake Pump Station Chemical Improvements

Closes 10/20/2026Opened 9/5/2026

City of Clearwater·Florida

71% match

Wastewater Collections Point Repair and Improvements

Closes 10/28/2026Opened 9/23/2026

Massachusetts Town of Hull·Massachusetts

71% match

Secondary Clarifiers, Grit & Building Upgrades

Closes 5/6/2027Opened 4/8/2026

The Metropolitan Water District of Southern California·California

71% match

Construction Manager/General Contractor Services for Direct Potable Reuse Demonstration Facility

Closes 11/3/2026Opened 9/4/2026

Missouri Office of Administration·Missouri

71% match

Water Supply System - Bryant Creek State Park

Closes 10/22/2026Opened 10/8/2026

City of Rosenberg·Texas

71% match

Wastewater Treatment Plant No. 1A – Clarifier No. 1 Rehabilitation

Closes 10/15/2026Opened 9/21/2026

California Department of Parks and Recreation·California

71% match

C26863016 HEARST SAN SIMEON SHM - Reservoir #3 Water Treatment Plant Upgrade

Closes 10/23/2026Opened 9/23/2026

City of Colwich·Kansas

71% match

Colwich Wastewater Treatment Plant Improvements

Closes 10/14/2026Opened 9/22/2026

U.S. Department Of The Interior·New Mexico

71% match

Y--NGWSP Cutter Lateral Reach 21 Booster Plant

Closes 10/30/2026Opened 9/30/2026

Georgia City of Hephzibah·Georgia

71% match

Addition to Existing Water Pollution Control Plan

Closes 11/5/2026Opened 9/28/2026

City of Farmers Branch·Texas

71% match

2026 Water and Wastewater - Capital Improvements Plan - Phase #1

Closes 10/29/2026Opened 10/7/2026

Georgia City of Cartersville·Georgia

71% match

WATER TREATMENT PLANT CHEMICAL FEED AND CONTROL BUILDING UPGRADES

Closes 10/16/2026Opened 9/15/2026

Fort Pierce Utilities Authority·Florida

70% match

Continuing Contract for Water & Wastewater Systems Construction and/or Program Management Service ("Project Management")

Closes 11/2/2026Opened 10/6/2026

Arizona State Parks Board·Arizona

70% match

Wastewater Treatment Chemicals

Closes 10/19/2026Opened 10/2/2026

U.S. Department Of The Interior·Arizona

70% match

Y--GRCA 318719 North Rim & Springs Rehabilitation Program

Closes 10/13/2026Opened 10/6/2026

Georgia Macon Water Authority·Georgia

70% match

Rebuild Gravity Thickeners 1,2 and 3 and Clarifier #6 at Rocky Creek WRF

Closes 10/20/2026Opened 9/2/2026

Little Rock Water Reclamation Authority·Arkansas

70% match

SIDESTREAM TREATMENT IMPROVEMENTS

Closes 11/10/2026Opened 10/11/2026

U.S. Department Of Defense·Pennsylvania

70% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026