Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kentucky guideKentucky Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Kentucky
  4. ›Closed bids
  5. ›Design of Town Branch Wet Weather Storage Phase 2

Lexington-Fayette Urban County·Kentucky

Design of Town Branch Wet Weather Storage Phase 2

Closes 6/5/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Lexington is seeking a proposal for the design of the Town Branch Wet Weather Storage Phase 2 project. The project aims to address wet weather storage needs in the area. A mandatory preproposal meeting will be held on May 22, 2026, at 10:00 AM EST. The meeting will be located at 125 Lisle Industrial Avenue, Lexington, KY. • The proposal should include a detailed design for the wet weather storage system. • The proposal should address the project's technical requirements and specifications. • The proposal should include a detailed cost estimate and project timeline. • The proposal should demonstrate the proposer's experience and qualifications for the project.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brian Marcum

[email protected]

(859) 258-3320

Key dates

Opened
5/15/2026
Questions due
5/27/2026
Pre-bid meeting
5/22/2026Mandatory
Closes
6/5/2026

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
RFP-29-2026 Addendum 1

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work, which involves the design of a wet weather storage system. The cost of such a project can range from a few hundred thousand dollars to several million dollars, depending on the complexity and size of the system. Assuming a moderate-sized project, the budget can be estimated to be around $500,000 to $2 million. The actual budget may vary depending on the specifics of the project and the proposer's cost estimate.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Tracy, CA·California

Top match · 66%

Temporary Transit Bus Parking & Storage Yard

Closes 10/21/2026Opened 10/1/2026

Tangipahoa Parish Government·Louisiana

66% match

PROJECT: 065 TANGIPAHOA PARISH STORMWATER DRAINAGE ENHANCEMENTS THROUGH CULERT MODIFICATIONS IN TICKFAW & MAUREPAS WATERSHEDS PROJECT

Closes 10/21/2026Opened 9/14/2026

City of Wheaton·Illinois

66% match

City of Wheaton Wells and Storage Study Re-Bid

Closes 10/15/2026Opened 9/24/2026

Town of Eatonville·Florida

66% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Wheaton·Illinois

66% match

City of Wheaton Wells and Storage Study Re-Bid

Closes 10/22/2026Opened 9/24/2026

Johnson County·Kansas

66% match

Camp Branch Park - Phase One Design Services

Closes 10/15/2026Opened 9/17/2026

City of Farmers Branch·Texas

66% match

2026 Water and Wastewater - Capital Improvements Plan - Phase #1

Closes 10/29/2026Opened 10/7/2026

Consolidated Waterworks District No. 1 of Pointe Coupee Parish·Louisiana

65% match

Consolidated Waterworks District No. 1 of Pointe Coupee Parish - Contract No. 3 Water Distribution System Improvements (Lemoine's Trailer Park) Water Sector Program, Phase 2 (Re-Advertisement)

Closes 10/27/2026Opened 9/24/2026

City of Wheaton·Illinois

65% match

City of Wheaton Wells and Storage Study Re-Bid

Closes 10/22/2026Opened 9/24/2026

Catawba Regional Council of Governments·South Carolina

65% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Joint Municipal Water and Sewer Commission·South Carolina

65% match

Town of Pelion Water Main Improvements Phase 2

Closes 10/13/2026Opened 9/11/2026

County of Frederick, MD·Maryland

65% match

Water Distribution Improvements Phase II

Closes 10/29/2026Opened 9/9/2026

Consolidated Waterworks District No. 1 of Pointe Coupee Parish·Louisiana

64% match

Consolidated Waterworks District No. 1 of Pointe Coupee Parish - Contract No. 2 Water Distribution System Improvements (Riverbend Subdivision) Water Sector Program, Phase 2 (Re-Advertisement)

Closes 10/27/2026Opened 9/24/2026

Connecticut Town of Fairfield·Connecticut

64% match

2027-16 Storm Water Repair, Replacement, and Installation

Closes 10/14/2026Opened 9/24/2026

Sterling Heights·Michigan

64% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 10/13/2026Opened 9/30/2026

Town of Strasburg·Virginia

64% match

Town of Strasburg - Canoe Launch & Parking Access Improvements

Closes 11/5/2026Opened 9/24/2026

City of Farmers Branch·Texas

64% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

City of Norfolk·Virginia

64% match

CSRM Phase 1A Floodwall Construction - Preload & Wick Drains

Closes 10/29/2026Opened 9/29/2026

City of Watertown·South Dakota

64% match

Request for Proposals: Lease of Surplus Property, Project No. 2623D

Closes 10/21/2026Opened 10/8/2026

Missouri Office of Administration·Missouri

64% match

Water Supply System - Bryant Creek State Park

Closes 10/22/2026Opened 10/8/2026

Johnson County·Kansas

64% match

Camp Branch Park - Phase One Design Services

Closes 10/15/2026Opened 9/17/2026

U.S. Department Of Defense·New York

64% match

Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

Closes 10/19/2026Opened 9/17/2026

Town of Jupiter·Florida

64% match

Jupiter Community Park Restrooms, Utility Building, and Island Way Wellfield Improvements (W2109A&B)

Closes 10/13/2026Opened 9/1/2026

Minnesota Department of Natural Resources·Minnesota

64% match

Hinckley Area Office Rearing Ponds Water Supply

Closes 10/13/2026Opened 9/26/2026

James Island Public Service District·South Carolina

64% match

JIPSD PS-33 Force Main Capacity Upgrade Project Phase I

Closes 10/29/2026Opened 9/28/2026