Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Connecticut
  4. ›Construction
  5. ›Construction Manager-at-Risk for the Water Street Parking…

City of New London·Connecticut

Construction Manager-at-Risk for the Water Street Parking Garage Expansion Project

Closes 12/1/2026$7.5M – $10MInvitation for Bid
Get bids like this by emailBid source

Description

The City of New London is seeking a Construction Manager‑at‑Risk (CMAR) to oversee the expansion of the Water Street Parking Garage, adding approximately 250 net new parking spaces to support the upcoming Coast Guard Museum. The project will break ground in summer 2027 and is expected to be completed within 12‑18 months. The procurement is conducted as an Invitation for Bids, with a non‑mandatory pre‑proposal meeting and a firm deadline for questions and bid submission. The contract will require performance and payment bonds, extensive insurance coverage, and compliance with local prevailing‑wage and workforce‑localization goals. • Scope: Design‑build CMAR services for a 250‑space parking garage expansion (≈ $7‑10 M). • Schedule: Groundbreaking summer 2027; substantial completion 12‑18 months thereafter. • Procurement: IB with pre‑proposal meeting (Nov 4, 2026) and bid deadline Dec 1, 2026. • Bonds/Insurance: No bid bond; performance & labor/material bonds required after GMP; $2 M general liability, $10 M umbrella, etc. • Local hiring: Minimum 25 % local workforce, with 50 % of those from New London; apprenticeship goals apply. • Liquidated damages: $1,200 per day past substantial completion.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Joshua Montague

[email protected]

(860) 447-5215

Key dates

Opened
10/28/2026
Questions due
11/11/2026
Pre-bid meeting
11/4/2026
Closes
12/1/2026
Duration
12 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
2027-04 CONL

Budget estimate

$7,500,000 – $10,000,000

Based on typical parking garage construction costs of $25‑$35 k per space, a 250‑space addition suggests a base construction cost of roughly $6.3‑$8.8 M. Adding pre‑construction services, bonds, insurance, and contingency pushes the total contract value into the $7‑10 M range. The estimate assumes standard site conditions and no extraordinary utility relocations.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut City of New London·Connecticut

Top match · 96%

Construction Manager-at-Risk for the Water Street Parking Garage Expansion

Closes 12/1/2026Opened 10/28/2026

Maryland-National Capital Park and Planning Commission·Maryland

86% match

Construction Manager at Risk (CMAR) Services Historic Concord Manor – Preservation, Rehabilitation, and Infrastructure Improvements

Closes 11/17/2026Opened 9/21/2026

Connecticut City of New London·Connecticut

85% match

Outsourced Controller Services for the Water Street Parking Garage Expansion Pr

Closes 12/1/2026Opened 10/28/2026

Town of Manalapan·Florida

85% match

Construction Manager at Risk

Closes 11/5/2026Opened 10/6/2026

City of Cape Coral, FL·Florida

85% match

Construction Manager at Risk (CMAR) for Projects less than $4 Million

Closes 12/2/2026Opened 10/26/2026

City of New London·Connecticut

84% match

Outsourced Controller Services for the Water Street Parking Garage Expansion Project

Closes 12/1/2026Opened 10/28/2026

City of South Charleston·West Virginia

84% match

SC Development Authority- Construction Manager At Risk- Jefferson Park

Closes 11/9/2026Opened 10/14/2026

Maryland National Capital Park and Planning Commission·Maryland

84% match

CMAR FOR HISTORIC CONCORD MANOR

Closes 11/17/2026Opened 9/22/2026

Georgia Macon Water Authority·Georgia

83% match

Site 3 951 5th St. Maintenance Office Expansion

Closes 11/25/2026Opened 10/28/2026

Massachusetts Port Authority (Massport)·Massachusetts

83% match

MPA PROJECT NO. L1973 CENTRAL PARKING FACILITY OPTIMIZATION -CMAR RFQ

Closes 11/5/2026Opened 10/7/2026

Richland School District Two·South Carolina

83% match

Construction Management At-Risk (CMAR) Services for a Welcome Center and Community Hub

Closes 11/17/2026Opened 10/22/2026

Lexington County School District One·South Carolina

82% match

Construction Manager at Risk Services Maintenance Capital Program Group 2

Closes 11/2/2026Opened 10/2/2026

City of Meriden·Connecticut

82% match

RFQ-P027-32 New Pulaski School Construction Manager at Risk

Closes 11/19/2026Opened 10/22/2026

City of Fayetteville·North Carolina

82% match

CM@R-Public Safety Answering Point (PSAP) 911 Call Center

Closes 11/19/2026Opened 10/5/2026

Connecticut City of Meriden·Connecticut

82% match

New Pulaski School Construction Manager at Risk

Closes 11/19/2026Opened 10/22/2026

Nevada Government·Nevada

82% match

Construction Manager At Risk (CMAR) for Science and Engineering Building (SEB) Data Center Upgrades

Closes 11/5/2026Opened 10/6/2026

Greater Orlando Aviation Authority·Florida

82% match

Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517)

Closes 11/9/2026Opened 9/28/2026

Connecticut DAS Construction Services·Connecticut

82% match

Request for Qualifications for Construction Manager at Risk (CMR) Services

Closes 11/4/2026Opened 10/7/2026

Lexington County School District One·South Carolina

82% match

Construction Manager at Risk Services Maintenance Capital Program Group 3

Closes 11/2/2026Opened 10/2/2026

Alaska Native Tribal Health Consortium·Alaska

82% match

CONSTRUCTION MANAGER @ RISK (CMaR) OPPORTUNITIES

Closes 1/1/2036Opened 8/15/2024

Massachusetts Port Authority - Capital Programs·Massachusetts

81% match

L1973 CMAR RFQ – Central Parking Facility Optimization

Closes 11/5/2026Opened 10/7/2026

Spartanburg School District Two·South Carolina

81% match

Construction Management At Risk - Multiple Projects

Closes 11/10/2026Opened 10/9/2026

City of Bentonville·Arkansas

81% match

NOTICE OF REQUEST FOR QUALIFICATIONS – Construction Manager at Risk – East Battlefield & Adjacent Areas Roadway Improvements

Closes 11/16/2026Opened 10/18/2026

Lexington County School District One·South Carolina

81% match

Construction Manager at Risk Services Maintenance Capital Program Group 1

Closes 11/2/2026Opened 10/2/2026

Metropolitan Government of Nashville and Davidson County·Tennessee

81% match

CMAR for Hermitage Library Branch

Closes 11/3/2026Opened 10/8/2026