The Randolph Community College is re‑advertising a solicitation for building‑systems commissioning services for the renovation of a 25,000‑sq‑ft warehouse into the Applied Industrial Artificial Intelligence Center (AI2C). The selected vendor will collaborate with the design architect, general contractor, and college owners to provide design input, construction oversight, quality assurance, testing, and performance verification from design development through owner occupancy. Bidders must demonstrate prior experience in building construction and system commissioning and hold relevant certifications. The submission deadline is 2:00 PM on 10 November 2026.
• Scope includes review of design documents, development of commissioning plans, on‑site testing of HVAC, electrical, plumbing, fire‑life‑safety, and specialty AI‑lab systems.
• Provide construction‑phase quality assurance, coordination with architect and contractor, and post‑occupancy performance verification.
• Required deliverables: commissioning plan, test procedures, test reports, punch‑list items, and final commissioning certification.
• Project size: ~25,000 sf, CMU block walls, steel frame, concrete slab, built‑up roof; intended use: classrooms, labs, training spaces.
• Vendor must submit examples of similar projects and applicable certifications (e.g., CxA, LEED, ASHRAE).