Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›Gompers Prep 47th St Safety Enhancement

City of San Diego·California

Gompers Prep 47th St Safety Enhancement

Closes 11/19/2026$900k – $1.2MInvitation for Bid
Get bids like this by emailBid source

Description

The City of San Diego is seeking a qualified contractor to upgrade traffic‑signal and safety infrastructure along 47th Street near Gompers Preparatory Academy. The work includes installing two school‑warning flashing beacons, upgrading an existing traffic signal with audible countdown and left‑turn phasing, adding a new interconnect conduit, and performing associated civil, electrical, and pavement improvements. The contract is a lump‑sum award with an estimated construction value of $1.09 M, a 240‑working‑day (≈ 12 months) performance period, and mandatory compliance with the Project Labor Agreement, prevailing‑wage rules, SLBE/ELBE participation, and extensive bonding and insurance requirements. Bids must be submitted electronically via PlanetBids by 2 p.m. on 19 Nov 2026 following a mandatory pre‑bid meeting on 28 Oct 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Ron McMinn(Contract Specialist)

[email protected]

(619) 533-4618

Key dates

Opened
10/20/2026
Pre-bid meeting
10/28/2026Mandatory
Closes
11/19/2026
Duration
12 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
K-27-2514-DBB-3

Budget estimate

$900,000 – $1,200,000

The solicitation lists an estimated construction cost of $1,090,000. Assuming the contractor receives the full contract amount (typical for lump‑sum public‑works bids) and factoring standard profit margins of 5‑10 % plus overhead, the net earnings for the contractor are likely to fall between roughly $55,000 and $110,000. However, the total cash flow to the contractor (including reimbursable costs) will be around the full contract value, so a realistic budget range is $900,000 to $1,200,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Miami‑Dade County Department of Transportation and Public Works·Florida

Top match · 83%

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026

City of San Diego·California

82% match

Catalina Blvd Signal Interconnect

Closes 10/22/2026Opened 9/22/2026

City of Tracy·California

82% match

Traffic Signal Installation at Tracy Boulevard and Gandy Dancer Drive

Closes 10/28/2026Opened 9/26/2026

Nyc Department of Design and Construction·New York

81% match

85026B0094 - HWCSCHPQN - SAFE ROUTES TO SCHOOLS, QUEENS

Closes 11/9/2026Opened 6/22/2026

Town of Westwood·Massachusetts

81% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

City of San Clemente·California

81% match

FY 2027 Arterial Street Improvement

Closes 11/5/2026Opened 10/15/2026

City of San Diego·California

81% match

Front/Washington Signal Mod and Albatross/Washington HAWK

Closes 11/17/2026Opened 10/12/2026

City of Culver City·California

81% match

Safer Fox Hills - Phase 1, PZ923

Closes 10/22/2026Opened 8/24/2026

City of San Diego·California

81% match

Robb Field Gateway Path

Closes 10/29/2026Opened 9/28/2026

City of Pueblo·Colorado

81% match

Construction of Sun Mountain Boulevard

Closes 11/4/2026Opened 9/22/2026

New York City Department of Design and Construction·New York

81% match

85026B0091 - HWX405 - SOUTHERN BOULEVARD BICYCLE AND PEDESTRIAN SAFETY IMPROVEMENTS, THE BRONX

Closes 11/5/2026Opened 5/4/2026

Maryland State Highway Administration·Maryland

81% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of San Mateo·California

80% match

Peninsula Avenue and Delaware Street Traffic Signal Modification Project

Closes 10/22/2026Opened 9/17/2026

Los Angeles County Public Works·California

80% match

TDS0001709 San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

City of Santa Rosa·California

80% match

Downtown Connectivity to Support Housing Density

Closes 10/28/2026Opened 9/11/2026

Town of Los Gatos·California

80% match

709 University Avenue Drainage System Replacement Project

Closes 10/28/2026Opened 10/1/2026

Town of New Milford·Connecticut

80% match

Grove Street and Hine Hill Road Signal Installation Project, LOTCIP No. L095-0006

Closes 11/5/2026Opened 9/18/2026

City of Long Beach·California

80% match

R-7298 1st Street Pedestrian Improvements

Closes 11/10/2026Opened 10/7/2026

California Department of General Services·California

80% match

CONTRACT NUMBER: 26-336714; SITE COMPLIANCE AND IMPROVEMENTS ¿ PATTON LANDING CALIFORNIA TAHOE CONSERVANCY CARNELIAN BAY, PLACER COUNTY, CALIFORNIA; PROJECT NUMBER: 13891

Closes 11/10/2026Opened 10/2/2026

City of San Diego·California

80% match

Construction Consulting Services

Closes 11/4/2026Opened 10/20/2026

City of Minneapolis·Minnesota

79% match

BID-PW - Folwell Safe Routes to School

Closes 11/12/2026Opened 9/29/2026

City of Bakersfield·California

79% match

Adaptive Signal Coordination Along Ashe Road from Panama Lane to Club View Drive

Closes 10/29/2026Opened 10/8/2026

City of San Diego·California

79% match

Block 8R UUP

Closes 11/3/2026Opened 10/2/2026

City of Santa Monica·California

79% match

Safety Training

Closes 11/9/2026Opened 10/13/2026

City of Tracy·California

79% match

Traffic Signal Installation at Tracy Boulevard and Gandy Dancer Drive

Closes 10/28/2026Opened 9/26/2026