The City of Culver City is seeking a qualified contractor to execute the “Safer Fox Hills – Phase 1” streetscape improvement project. The work encompasses full‑street reconstruction, pavement and concrete work, traffic‑signal and lighting upgrades, utility adjustments, storm‑water management, and pedestrian/bike‑lane enhancements along a designated corridor. The contract is awarded to the lowest responsive and responsible bidder and includes strict schedule, bonding, and insurance requirements.
• Mobilization, traffic‑control (including computerized message signs), and site‑prep.
• Excavation, placement of crushed base, construction of new 5‑in. AC pavement, 2‑in. ARHM overlay, and associated concrete curb, median, sidewalk, and curb‑ramp works.
• Modification of two traffic signals, installation of RRFB beacons, ZICLA bus platforms, and extruded concrete bike‑lane barrier curbs.
• Utility adjustments (water vaults, manholes, drainage), SWPPP implementation, and compliance with prevailing‑wage, safety, and environmental standards.