The Rhode Island Fast Ferry (RIFF) Site Work Construction project involves comprehensive site development for a new ferry terminal. The contractor will place and compact back‑fill soil supplied by QDC, install a top layer of engineered fill, provide utility installations (water, electric, conduit, and final connections), construct paving and striping, install site lighting, create drainage systems subject to coastal council approval, and add ancillary features such as fencing, railroad‑crossing warning devices, landscaping, and a security gate with guard booth and cameras. The scope also requires compliance with OSHA 10‑hour construction safety, confined‑space training, prevailing‑wage and civil‑rights regulations, and a 20 % bid guarantee plus 100 % performance/payment bonds.
• Bulk earthwork (soil placement, compaction, engineered fill) using materials supplied by the agency.
• Utility installation (water, electrical, conduit, final hookups) and coordination with utility providers.
• Site infrastructure: paving, striping, lighting, drainage, fencing, railroad‑crossing warnings, landscaping, and security gate with camera system.
• Mandatory safety, labor, and civil‑rights compliance, plus bonding and bid‑guarantee requirements.