The Colorado Bureau of Investigation (CBI) is seeking a qualified contractor to perform a comprehensive HVAC and lighting upgrade at its GJ facility. The scope includes removal of existing HVAC equipment, installation of new HVAC units, integration of a non‑proprietary Alerton BAS (no alternates allowed), and a full lighting retrofit. The project is classified as prevailing‑wage, with the contractor responsible for any hazardous‑material testing and abatement. Work is to be performed continuously over an estimated 35‑month period, targeting completion by September 1 2029. The contract may be awarded to an HVAC or electrical firm acting as the lead contractor; a general contractor is not required. No bid alternates or additional technical narratives are permitted. The estimated project cost is $3,138,526.
• HVAC equipment removal, supply, and installation (including controls)
• Lighting design, demolition, and new installation
• Integration with existing Alerton BAS (no Honeywell alternatives)
• Compliance with prevailing‑wage, Davis‑Bacon Act, and EO 13706 requirements
• Contractor responsible for hazardous‑material testing/abatement if needed
• Continuous construction schedule (~35 months) with no phased milestones
• Mandatory warranties: 5‑year contractor correction period + 1‑year manufacturer warranty