The City of Orlando is soliciting sealed, electronic bids for the “Virginia Dr., Forest Dr., and Corrine Dr., Complete Streets Project.” The scope encompasses full roadway reconstruction, drainage, landscaping, lighting, signalization, pavement markings, and associated civil‑engineering works along three major corridors. Bidders must submit a detailed price proposal for each major category (drainage, landscape, lighting, roadway, signalization, signing & pavement markings) using the OpenGov portal by the November 19, 2026 deadline. A non‑mandatory pre‑bid virtual meeting is scheduled for October 29, 2026. The project will require coordination with the Public Works Department, adherence to city specifications, and delivery of all materials, installation, and testing.
• Full reconstruction of Virginia, Forest, and Corrine Streets (roadway, curb, gutter, sidewalks).
• Installation of new drainage structures, inlets, manholes, and culverts.
• Landscape planting, tree removal, soil improvement, and irrigation.
• Street lighting fixtures, poles, and control systems.
• Traffic signal hardware, controllers, fiber‑optic communication, and detection systems.
• Comprehensive signing, pavement marking, and safety devices.
• All work to be performed under city‑issued specifications with required permits and inspections.