Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Closed bids
  5. ›RIVERSIDE REGIONAL WATER QUALITY CONTROL PLANT HEADWORKS OVERFLOW

City of Riverside·California

RIVERSIDE REGIONAL WATER QUALITY CONTROL PLANT HEADWORKS OVERFLOW

Closes 9/11/2026$150k – $200kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Riverside is soliciting bids for the construction of an overflow outlet at the Riverside Regional Water Quality Control Plant headworks. The work includes installing a concrete valley gutter, curb, sidewalk, asphaltic‑concrete berm, pavement, HDPE pipe, grated inlets, and connecting to an existing concrete‑lined basin, with associated site preparation, excavation, and back‑fill. The contract is a lump‑sum award with required performance and payment bonds equal to 100 % of the contract price, and a 10 % bid bond must be submitted. The project must be completed within 90 working days after the Notice to Proceed, and strict liquidated‑damage provisions apply for schedule overruns. • Scope: Concrete civil works, HDPE pipe installation, overflow structure, asphalt paving, and site utilities. • Eligibility: Requires a California Class “A” General Engineering or Class “C‑34” Pipeline Contractor license; bid bond 10 % of proposal; performance/payment bonds 100 % of contract price. • Key Dates: Pre‑bid walk 8/25/2026 (optional), Q&A cutoff 9/1/2026, bid submission deadline 9/11/2026 12 PM PT. • Financials: Estimated contract value $173,804; bid bond 10 % (~$17,380) plus required bonds and insurance. • Requirements: Prevailing‑wage compliance, insurance limits, spill‑containment plan, and detailed subcontractor disclosures.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Frank Grosso

Key dates

Opened
8/18/2026
Questions due
9/1/2026
Pre-bid meeting
8/25/2026
Site visit
8/25/2026
Closes
9/11/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237130
Solicitation №
8268

Budget estimate

$150,000 – $200,000

The solicitation’s engineer’s estimate lists the total contract value at $173,804. Assuming the contractor’s profit margin ranges from 5 % to 15 % after covering labor, materials, bonds, and insurance, the net earnings could fall between roughly $150 k (lower‑margin, higher‑cost) and $200 k (higher‑margin, efficient execution). Factors influencing the range include subcontractor pricing, material cost fluctuations (especially HDPE pipe and asphalt), and any change‑order work that may be added.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Chittenden County Regional Planning Commission·Vermont

Top match · 64%

Ongoing Call: RFQ TO MUNICIPALITIES & ORGANIZATIONS TO SERVE AS WATER QUALITY IMPROV

Closes 12/31/2026Opened 7/18/2022

Upper Occoquan Service Authority·Virginia

63% match

UOSA IFB 27-02 P2NR+ Construction

Closes 10/22/2026Opened 8/24/2026

City of Salisbury·Maryland

63% match

Park Water Treatment Plant PFAS Study 1

Closes 10/20/2026Opened 9/18/2026

City of Phoenix·Arizona

63% match

SUB-REGIONAL OPERATING GROUP - 91ST AVENUE WASTEWATER TREATMENT PLANT AERATION REHABILITATION - ENGINEERING SERVICES

Closes 10/16/2026Opened 9/24/2026

Consolidated Waterworks District No. 1·Louisiana

63% match

CONSOLIDATED WATERWORKS DISTRICT NO. 1 - SCHRIEVER WATER TREATMENT PLANT - EFFLUENT SEPARATION

Closes 10/14/2026Opened 9/18/2026

South Florida Water Management District·Florida

62% match

DISPERSED WATER MANAGEMENT PROGRAM ON AGRICULTURAL LANDS READINESS AND ENVIRONMENTAL PROTECTION INTEGRATION IN THE AVON PARK AIR FORCE RANGE SENTINEL LANDSCAPE

Closes 10/23/2026Opened 8/26/2026

Dickenson County·Virginia

62% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

Beaufort - Jasper Water & Sewer Authority·South Carolina

62% match

Cross-Connection Control and Backflow Program Support Services

Closes 10/30/2026Opened 9/29/2026

Maryland City of Salisbury·Maryland

62% match

Park Water Treatment Plant PFAS Study 1

Closes 10/20/2026Opened 9/19/2026

Mississippi State University·Mississippi

62% match

Recirculating Tailwater Reduces Nutrient Loss in Agriculture

Closes 10/13/2026Opened 9/25/2026

City of New Iberia·Louisiana

61% match

Sucrose Drive WWTP Headworks Odor Control Addition

Closes 10/16/2026Opened 9/18/2026

Town of Front Royal·Virginia

61% match

Wastewater Treatment Plant Centrifuge Facility

Closes 10/16/2026Opened 9/9/2026

Texas Brazos River Authority·Texas

61% match

Hydrostatic Pressure Relief System Assessment and Downstream River Channel Improvements at Sterling C. Robertson Dam

Closes 10/20/2026Opened 8/17/2026

Martin County Purchasing·Florida

61% match

Tropical Farms Water Treatment Plant Expansion

Closes 10/21/2026Opened 8/19/2026

Save Our Saluda·South Carolina

61% match

RFQ for Water Quality Monitoring - Upper Saluda Source Water Protection Project

Closes 10/16/2026Opened 10/5/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

61% match

TDCJ - Water Treatment Plant for Memorial

Closes 11/23/2026Opened 10/7/2026

City of Riverside·California

61% match

Landscape and General Outside Maintenance Services for Freeways and On Ramps

Closes 11/4/2026Opened 10/6/2026

City of Rapid City·South Dakota

61% match

North Rapid Reservoir at Elk Vale Rd., Project No. 2922/CIP No. 50474

Closes 10/28/2026Opened 10/7/2026

Tarrant Regional Water District·Texas

61% match

Rapid Response Environmental Services

Closes 10/20/2026Opened 10/2/2026

University of California, Agriculture and Natural Resources·California

61% match

RFQ - Civil Engineering and Design Services - UCANR KREC

Closes 10/15/2026Opened 9/24/2026

Town of Jupiter·Florida

61% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/3/2026Opened 10/6/2026

Zone 7 Water Agency·California

61% match

Environmental Mitigation Professional Services

Closes 10/27/2026Opened 10/6/2026

Minnesota Department of Natural Resources·Minnesota

61% match

Hinckley Area Office Rearing Ponds Water Supply

Closes 10/13/2026Opened 9/26/2026

El Paso Water·Texas

61% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

El Paso Water·Texas

61% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026