Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Ohio
  4. ›Construction
  5. ›Installation of 7,000‑ft separated shared‑use asphalt path…

City of Fairfield·Ohio

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026$4.9M – $6MInvitation for BidLogin required
Get bids like this by emailBid source

Description

This solicitation calls for the design‑build installation of a 7,000‑ft separated shared‑use asphalt path along Pleasant Avenue (US 127) in Butler County, Ohio. The work includes full‑depth resurfacing of the existing roadway, installation of new pavement markings, construction of storm sewer structures, replacement of curbs and gutters, placement of a 2,300‑ft 12‑in water main, earthwork, retaining walls, and construction of signalized crosswalks. The project must be completed within 270 calendar days, with final paving required by November 1 2027. The base bid estimate is $4.907 M, and the scope carries a 7 % Small Business Enterprise (SBE) goal. • 7,000 ft of new shared‑use asphalt path with accompanying road resurfacing. • Utility upgrades: 2,300 ft of 12‑in water main, storm sewer, curb & gutter replacement. • Traffic improvements: new pavement markings, signalized crosswalks, retaining walls, and drainage structures. • Completion required within 270 days; final paving by 1 Nov 2027. • Base bid estimate $4.9 M, with a 7 % small‑business participation goal.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
10/23/2026
Questions due
11/10/2026
Closes
11/17/2026
Duration
270 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
BUT-US127-0.61 PID 120879 (Pleasant Ave)

Budget estimate

$4,900,000 – $6,000,000

The solicitation lists a base bid estimate of $4.907 M for the scope of work. Considering typical contingency allowances, potential change orders, and the 7 % SBE goal, the final contract value is likely to fall between $5 M and $6 M. Factors influencing the range include material price fluctuations (asphalt, concrete, steel), unforeseen site conditions, and the cost of additional utility work or traffic control measures.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Toledo·Ohio

Top match · 80%

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

City of Indianapolis·Indiana

79% match

SD-23-103 Thoroughfare Drainage Improvements Area 8

Closes 10/29/2026Opened 10/2/2026

Maryland State Highway Administration·Maryland

78% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

Georgia Wilcox County Board of Commissioners·Georgia

78% match

2026 TIA Road Resurfacing Improvements - Pleasant View Road

Closes 11/5/2026Opened 10/7/2026

City of Columbus·Ohio

78% match

Roadway - N Knot - 315 at Lane Avenue

Closes 11/4/2026Opened 10/2/2026

Medina County - Engineering·Ohio

78% match

T.H. 72 Buffham Road Guardrail Improvement OPWC #CI06AD

Closes 10/29/2026Opened 10/14/2026

Camden County·New Jersey

78% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

U.S. Department Of Defense·Michigan

78% match

W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation

Closes 11/30/2026Opened 10/7/2026

Ohio Department of Natural Resources·Ohio

78% match

PWC Dillon State Park Asphalt Patching

Closes 11/5/2026Opened 10/16/2026

City of Cincinnati·Ohio

78% match

Sycamore Street Retaining Wall PID 122597

Closes 11/13/2026Opened 9/10/2026

Montgomery County OH·Ohio

78% match

Northeast Logistics Access Project, City of Vandalia & Butler Township, Montgomery County, Monroe Township, & Miami County. MOT-DIA PID115795 JOB#2021-20

Closes 11/4/2026Opened 10/9/2026

Nevada Government·Nevada

78% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Fairlawn·Ohio

78% match

Smith Road SRTS – Fairlawn (PID 120279)

Closes 11/9/2026Opened 10/16/2026

City of Cincinnati·Ohio

77% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/5/2026Opened 10/22/2026

Miami-Dade County Department of Transportation and Public Works·Florida

77% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

Town of Prosper·Texas

77% match

Coit Road Paving and Drainage Improvements (Prosper Trail-1400' North of Frontier), CIP 2534-ST

Closes 11/5/2026Opened 10/9/2026

City of Cincinnati·Ohio

77% match

Sycamore Street Retaining Wall PID 122597

Closes 11/6/2026Opened 10/9/2026

City of Centerville, OH·Ohio

77% match

Iron Horse Trail Resurfacing

Closes 11/5/2026Opened 10/22/2026

Minnesota Department of Transportation·Minnesota

77% match

260138 SP 8208-45 – Grading, Bituminous Surfacing, Roundabout, ADA Improvements and Lighting

Closes 11/18/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

77% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Maryland State Highway Administration·Maryland

77% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Cincinnati·Ohio

77% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/12/2026Opened 9/10/2026

ODNR-Division of Mineral Resources Management·Ohio

77% match

CRAg01 - Hawk Highwalls

Closes 11/5/2026Opened 9/30/2026

City of Cleveland·Ohio

77% match

E. 93rd Street Opportunity to Thrive Project (Miles Ave to Quincy Ave)

Closes 10/30/2026Opened 9/17/2026

Morgan County - Engineers Office·Ohio

77% match

Creek Road EWP Project - Re-Bid

Closes 10/29/2026Opened 10/14/2026