Cube Construction Services LLC is soliciting proposals for the CUNY Baruch College Information & Technology Building 2nd, 3rd, & 4th Floor Library Renovation & Associated Asbestos Abatement project located at 151 East 25th Street, New York, NY, 10010.
Please use the link below to access the project drawings, specifications, addenda, and photos:
https://www.dropbox.com/scl/fo/v4qreiifiyae761t3be2w/AGJPuoX-afL21_yoEWRTzxg?rlkey=p2l4x8xr9du1d78kcpqr08roy&st=0i4thbus&dl=0
Brief scope of work:
Renovation of ~39,000sf on the second and fourth floors of the Baruch College Information and Technology Building Library. The work includes selective demolition and hazardous-material abatement; new partitions, interior glazing, doors, custom millwork, flooring, ceilings, acoustical treatments, toilet-room renovations, signage, and related finishes; and modifications to the fire-suppression, plumbing, HVAC and BMS controls, electrical and lighting, telecommunications, audiovisual, and fire-alarm systems.
The scope of work includes, but is not limited to:
Abatement
Perform asbestos, lead, and universal waste abatement as indicated in the documents.
Demolition
Remove carpet, base, ceilings and soffits.
Remove millwork as marked and cut the slab for the glass partitions.
Gut the 4 restrooms down to the studs and slab.
Salvage, store and reinstall wall-mounted items, door leaves and signage.
Protection and debris removal.
Drywall, Framing & Acoustic Ceilings
New sound-rated partitions
Suspended drywall ceiling & soffits
Acoustic ceiling tile & grid.
Insulation, acoustic sealant and blocking.
Architectural Millwork & Wood Paneling
Curved wood-veneer reference desk.
Wood veneer and perforated veneer wall and soffit paneling in the meeting room.
Custom table and desk in the meeting room.
Solid-surface vanity tops.
Wood base.
Frameless Glass Partitions, Doors, Frames & Hardware
Frameless acoustic laminated glass partitions.
Frameless glass doors with Dorma hardware.
Recessed head and sill channels, and transoms.
Hollow metal frames, doors and a pocket door kit.
Flooring
Floor prep & leveling
Carpet tile on the 2nd floor atrium and meeting room, and the 4th floor commons and study rooms.
Wall base.
Alt 1: Refinish about 12,500 SF of existing wood floor on the 2nd floor.
Ceramic Tile & Stone
Full-height porcelain wall tile as required.
New floor tile on waterproofing, sloped to the drains.
Stone saddles & Trims.
Painting
Paint all new work.
Paint restrooms & Access panels.
Paint all walls full height, plus hollow metal doors, frames, casements, columns and existing ceilings as required by the drawings.
Toilet partitions & Accessories
Stainless steel ceiling-hung toilet partitions hung from the existing support structure.
ADA toilet accessories in 4 restrooms: grab bars, mirrors, dispensers, hand dryers.
Plumbing
Replace fixtures in kind in 4 restrooms.
Branch piping back to the risers, balancing valves and trap primers.
New drain covers, and reinstall the existing drinking fountains.
Other plumbing work as detailed in the documents.
Fire Sprinkler
Modify existing wet system as required.
Remove existing & add new concealed heads.
HVAC
Install new VAV boxes & reconnect relocated ones.
New ductwork, diffusers, slot diffusers & transfer silencer.
Install new fin-tube radiation as required.
Insulation, testing & balancing.
Alt 1: New diffusers as required by the contract documents.
Alt 2: New fin tube heaters on the 4th floor as required.
Controls & BMS
Tie the new & relocated VAVs into existing BMS.
Tie the lighting controls to the same system.
Programming as required.
Electrical
Lighting & power demolition.
Install New lighting fixtures, receptacles, and floor boxes. Conduit & boxes for AV & telecom.
Power for study pods, VAVs, hand dryers, and AV.
Install new breakers in existing panels.
Alt 1: New lighting as required.
Fire alarm
Modify the existing system and install new speakers/strobes and study pod strobes.
Relocate smoke detectors & extend existing devices to new wall finishes along with required programming.
AV/ IT/ Telecom
Cat 6A cabling for outlets, Wi-fi access points, and AV.
Meeting room video-conferencing system.
Displays in study rooms & digital signage displays.
Table boxes, mounts & programming
This project is subject to PLA (Project Labor Agreement) requirements.
Kindly submit your proposal and NYS DOL certificate by October 26, 2026.
Service-Disabled Veteran-Owned Business (SDVOB)
SDVOB Goal: 6.00%
Minority / Women Business Enterprise contracting goals (MWBE)
MBE Goal: 18.00%
WBE Goal: 12.00%
Disadvantaged Business Enterprise contracting goals (DBE)
DBE Goal: 0.00%