The City of San Clemente is seeking a qualified contractor to replace two grit‑classifier trains at its Water Reclamation Plant. The work includes demolition of existing equipment, installation of new pumps, classifiers, associated piping, electrical power & control systems, and complete testing/commissioning while maintaining plant operations. The contract is for a 180‑working‑day duration with strict schedule coordination, permitting, and environmental compliance requirements.
• Demolition of existing grit classifiers, pumps, and associated DI & PVC piping, with at least one train remaining operational.
• Supply and install new horizontal recessed‑impeller pumps, grit classifiers, new 4‑in. DI and PVC process piping, valves, supports, and seismic anchorage.
• Electrical & instrumentation upgrades: conduit, power & control conductors, breakers, PLCs, pressure/flow/level sensors, and integration with existing MCC/SCADA.
• Civil/site work: staging areas, platform modifications, concrete restoration, and strict waste‑management/recycling compliance.
• Mandatory pre‑bid meeting/site walk on 4 Nov 2026, electronic bid submission by 19 Nov 2026, and a 180‑day contract performance period.